Airside doors
Wide door openings on the apron face, with door headers and a canopy so ULDs stay dry between the aircraft and the floor.
Door framesLarge-project capacity
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
Two faces
Freight crosses the building from the apron to the road. The frame keeps the floor between them open.
Inside the terminal
Wide door openings on the apron face, with door headers and a canopy so ULDs stay dry between the aircraft and the floor.
Door framesA long clear span for ULD build-up and break-down, with roller beds and transfer vehicles that need no columns in the way.
Long-span steel structuresRacks and elevated transfer vehicles for ULDs may be tied to the building or stand free. Their loads are agreed with the handling supplier.
Equipment platformsPharma and perishables get cold rooms inside the shell, with insulated panels and roof openings for the refrigeration.
Cold storage building packageA dock wall with doors, levelers and a continuous canopy on the road side.
Loading dock canopiesA two-storey office block for agents, airline staff and customs, often with a view onto the floor.
Steel mezzanine framesFrom our project files
SMC3 in Thailand is one of a series of warehouses. Siam Lubric stores lubricants and chemicals in segregated areas, and Vic Ong in the Philippines took about 220 t shipped overseas as one package.
See the Vic Ong project
Photo
Photo
Photo
Photo
Scope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
6 answers, grouped by topic.
Wide enough for ULDs on dollies and transfer vehicles, often several doors along the apron face. The door maker and the handling layout set the openings, and we design the headers.
Yes, when the handling supplier gives the loads and the tie points. Some systems stand free and some are tied to the frame; that is agreed before design.
Yes. Cold rooms are built inside with insulated panels, and the roof steel is framed for the refrigeration units above them.
The plant fabricates 2,500 t of structural steel a month, so a large terminal with its offices and canopies can run as one order shipped by area.
Our references are warehouses with the same frames, such as SMC3 and Siam Lubric in Thailand and Vic Ong in the Philippines, about 220 t. Siam Lubric stores lubricants and chemicals in segregated areas.
To the editions in the contract, typically IBC 2024, ASCE 7-22 and AISC 360. Approval and the PE seal stay with your Engineer of Record.
Keep reading
Price it or partner with us
Share the apron and dock layout, the handling system and the cold rooms. We will price the frame, the door headers and the canopies.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833