Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Landside

FBO and terminal support buildings

FBOs and terminal support: one foot landside, one foot airside

An FBO greets passengers on the landside and parks aircraft on the airside, often with a hangar attached. Around the terminal, GSE shops, rescue stations and airline buildings follow the same rule. Our plant fabricates 2,500 t of structural steel a month, so an airport program can order every building from one fabricator.

Airside
Aerial view of a red curved steel roof over a long-span building in Western Australia, framed by World Steel

The security line runs through the middle of most FBOs: passengers come in on one side and walk out to the aircraft on the other.

Large-project capacity

Every building on an airport program, from one plant

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

Either side of the fence

Six buildings around a terminal, sorted by where they stand

Landside

Curbside and parking canopies

Long canopies at the curb and over parking, where wind uplift and the column base govern.

Steel canopies →
On the line

FBO lounge and office

A glass front to the apron, a lounge and crew rest, offices for line service, and a canopy where passengers walk to the aircraft.

Entrance covers →
Airside

Corporate hangar attached

A clear-span hangar beside the lounge, sharing a wall, with its own door header and fire separation set by the design team.

Aircraft hangar buildings →

Rescue and fire station

Apparatus bays with tall doors facing the airfield, crew quarters and a watch room with a view of the runway.

Industrial overhead doors →

Airside

Four things that change once the building faces the apron

Height limits

Buildings near runways and taxiways have height limits. The airport and the design team check them, and the FAA notice where it is required, before the frame is set.

Jet blast and prop wash

Walls and canopies facing the apron may see blast from engines. The design team gives the pressure, and the cladding and girts are sized for it.

Security line

The building is often part of the security fence. Doors, openings and the wall line follow the airport security plan.

Delivery airside

Steel for an airside building is delivered through a controlled gate, so shipping is marked and sequenced to keep gate trips short.

From our project files

Long spans and curved roofs from our plant

A curved long-span roof in Western Australia and our aircraft hangar in Thailand show the kind of frames an FBO and its hangar need: wide, open and finished to be seen.

See the hangar project
Drone shot of a curved-roof steel building close to completion Photo
Curved steel roof frames seen from the street during erection Photo
Edge of a building where steel columns meet the curved rafters Photo
Rendering of the open steel hangar frame in Thailand 3D model

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Frame, canopy, hangar and support-building steel designed to the contract documents
  • Girts and cladding supports sized for the blast pressure the design team gives
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication in our IAS AC472-accredited plant in Vietnam, marked for airside delivery

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Airport approvals, height checks and the FAA notice where required
  • Apron, fuel systems, security fencing and site work
  • Erection, glazing, doors and fit-out

Questions from US contractors

FBO and airport support steel: questions and answers

6 answers, grouped by topic.

FBOs and hangars 3 answers

Can the FBO and its hangar be one building?

Yes. The lounge and the hangar can share a wall and a frame line, with the fire separation between them set by the design team.

Can one order cover every building on an airport program?

Yes. The plant fabricates 2,500 t of structural steel a month, so the FBO, hangars, GSE shop and canopies can ship as one program, each with its own erection sequence.

Do you design the canopy where passengers board?

Yes. Apron and entrance canopies are designed with the building frame, for wind uplift and the column bases.

Working airside 3 answers

Who checks building height near a runway?

The airport and the design team, including the FAA notice where it is required. We set the frame to the height they approve.

Can the walls take jet blast?

Yes, when the design team gives the blast pressure. Girts, cladding supports and fixings are sized for it.

How is steel delivered to an airside site?

Through the airport’s controlled gate. Bundles are marked and sequenced by erection area so each gate trip carries what the crew needs next.

Keep reading

Related pages

Price it or partner with us

Send the airport layout and the building list.

Share the site plan with the security line, the FBO and hangar sizes and the support buildings. We will price the steel building by building.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details