Operator
Free Zone Aruba N.V., founded in 1996 and fully government-owned.
Zone profile
What Free Zone Aruba and the government say about the zone.
Free Zone Aruba N.V., founded in 1996 and fully government-owned.
About 40 ha (111 acres) next to the Barcadera cargo port.
About 3 km (2 miles) from the international airport.
A profit in 2025, the second year in a row.
Sources: Free Zone Aruba website, Government of Aruba (September 2026). Check land and leases with FZA.
Zone land
FZA lists the land still available for development in each part of the zone; each card links to the buildings that fit it.
≈12 ha (29 acres)
Light industry, assembly and technology firms.
Manufacturing plants≈12 ha (30 acres)
Warehousing and distribution for re-export.
Warehouse buildings≈20 ha (50 acres)
Showrooms, offices and service buildings.
Multi-storey steel framingBuilding sizes
Illustrative sizes. We set the real building to your lot, your use and your engineer’s basis.
36 m × 72 m (118 × 236 ft)
2,592 m² with docks
30 m × 48 m (98 × 157 ft)
1,440 m² with a mezzanine
24 m × 36 m (79 × 118 ft)
864 m² with a glazed front
Sun and wind
Barcadera sits on a dry, windy coast with strong sun all year. Your engineer sets the wind basis; we design the frame, cladding fixings and doors to it and pick coatings that hold up to UV and salt.
Delivery
Our CIF terms land the steel at Barcadera, next door to the zone.
From our plant
Real World Steel photos from our plant and projects in Vietnam. None is shown as an Aruba site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Aruba industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
Next to Aruba’s Barcadera cargo port, about 3 km from the international airport, according to Free Zone Aruba.
About 40 ha in its first phase, with about 12 ha for industry and technology, 12 ha for international trade and 20 ha for services and showrooms still open.
FZA offers warehouses to lease or land to build your own facility. We design and fabricate the steel building for the lot you hold.
Yes. Your engineer of record sets the wind basis; we design the frame, doors and cladding fixings to it.
No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.
By sea to Barcadera, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking. We supply FOB Vietnam or CIF Barcadera.
Send the lot, the use and your engineer’s code basis. We design, fabricate and ship CIF Barcadera.