Logistics
Cross-dock and distribution buildings.
Warehouse buildingsBarcadera harbour
On CIF Barcadera, our steel lands at the quay next to the parcels. Your broker clears it, and bundles labelled by building and area go straight to your lot in erection order.
Allowed uses
The Aruba Ports Authority lets the parcels for these uses; retail, housing and hazardous storage are not allowed. Each card links to the buildings that fit.
Cross-dock and distribution buildings.
Warehouse buildingsClear-span stores with racking loads.
Warehouse buildingsLoading halls where trucks unload under cover.
Long-span steel structuresCompact halls for small-scale production.
Manufacturing plantsBuilding sizes
Illustrative sizes. We set the real building to your parcel, your trucks and your engineer’s basis.
30 m × 60 m (98 × 197 ft)
1,800 m² with drive-through doors
24 m × 54 m (79 × 177 ft)
1,296 m² with racking
18 m × 36 m (59 × 118 ft)
648 m² with a mezzanine office
Delivery
Our CIF terms land the steel at Barcadera, a few hundred metres from the parcels.
From our plant
Real World Steel photos from our plant and projects in Vietnam. None is shown as an Aruba site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Aruba industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
About 10 ha of Aruba Ports Authority land by the Barcadera harbour, let as about 15 parcels on long lease, according to APA and 2023 reports.
Buildings for logistics, warehousing, indoor loading and small-scale manufacturing. Retail, housing and hazardous storage are not allowed.
Yes. We design and fabricate clear-span loading halls, racked stores and small factories for the parcel you hold.
Yes. Your engineer of record sets the wind basis; we design the frame and doors to it.
No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.
By sea to Barcadera, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking. We supply FOB Vietnam or CIF Barcadera.
Send the parcel, the use and your engineer’s code basis. We design, fabricate and ship CIF Barcadera.