Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

North Side · District

Steel buildings and structural steel for North Side, Anguilla

North Side runs along the north coast near Shoal Bay, one of the island’s best-known beaches, with villas, small hotels and beach restaurants.

The centre · Main village North Side

Site conditions in North Side

What the site asks of your steel

Wind
Open north coast
Surge
Beachfront sites
Air
Salt spray
Ground
Sand and limestone

Our design note. North Side builds villas, small hotels and beach restaurants on an open coast. Wind design and marine coatings shape the steel.

North Side at a glance

The ground, the work and the road in

Ground and climate

Limestone plateau sloping to beach sand.

What gets built

Tourism, villas, restaurants and housing.

Getting steel there

About fifteen minutes from the Road Bay cargo port.

Towns: North Side · Shoal Bay

Steel we recommend

What we fabricate for North Side

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Resorts and villas

Hotel buildings, villas, beach restaurants and spa roofs on the coast.

Multi-story steel buildings →

Shops and offices

Shops, offices, showrooms and mixed-use blocks.

Commercial steel buildings →

Cold storage

Cold rooms for hotels, supermarkets and the fishing fleet.

Cold storage buildings →

Contractors in North Side

You win the job in North Side. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in North Side

Can you supply small hotels near Shoal Bay?

Yes. Multi-storey frames and villa kits with marine coatings.

Is the north coast harder on steel?

Open water means stronger coatings or galvanizing near the shore.

The centre

Other districts: the centre

George Hill, The Farrington, The Valley, The Quarter, Stoney Ground and North Side: the capital, the airport, government and most homes.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Anguilla. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Anguilla

Talk to us about steel for North Side

Send the drawings or the site, size and use. We design or detail the steel for North Side’s hurricane, seismic and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Road Bay, Sandy Ground. WhatsApp, email or a video call with our engineers, booked at an hour that suits The Valley. Our contact page for Anguilla has the ports, the local time and the form.