Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

East End · District

Steel buildings and structural steel for East End, Anguilla

East End is the quiet eastern tip of Anguilla, with Savannah Bay, Captain’s Bay and Scrub Island offshore, open to the ocean on three sides.

The east end · Main village East End Village

Site conditions in East End

What the site asks of your steel

Wind
Open ocean on three sides
Surge
Low ground
Air
Salt spray
Ground
Ponds and sand

Our design note. East End needs homes, villas and community buildings open to the ocean. Full wind design and galvanized steel come first.

East End at a glance

The ground, the work and the road in

Ground and climate

Low limestone, salt ponds and beach sand.

What gets built

Housing, villas, small farms and community services.

Getting steel there

About thirty minutes from the Road Bay cargo port.

Towns: East End Village · Savannah Bay · Captain’s Bay · Junks Hole

Steel we recommend

What we fabricate for East End

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Resorts and villas

Hotel buildings, villas, beach restaurants and spa roofs on the coast.

Multi-story steel buildings →

Farm buildings

Farm stores, livestock sheds and packhouses.

Agricultural steel buildings →

Schools, halls and shelters

Classrooms, community halls and sports buildings that double as hurricane shelters.

Sports facilities and arenas →

Contractors in East End

You win the job in East End. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in East End

Is the east end far from the port?

It is the longest haul on the island, still about half an hour. We pack complete kits per building.

Can you supply farm buildings?

Yes. Farm stores and sheds with clear spans.

The east end

Other districts: the east end

Sandy Hill, Island Harbour and East End: fishing villages, Savannah Bay and the quiet eastern tip.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Anguilla. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Anguilla

Talk to us about steel for East End

Send the drawings or the site, size and use. We design or detail the steel for East End’s hurricane, seismic and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Road Bay, Sandy Ground. WhatsApp, email or a video call with our engineers, booked at an hour that suits The Valley. Our contact page for Anguilla has the ports, the local time and the form.