Certificates & accreditations
ISO 9001:2015 certificate, quality management system
World Steel's quality management system, audited and found to conform to ISO 9001:2015. Certified since September 2023.
PDF · 327 KB · 1 page · English
The certificate in force today for World Steel Construction JSC: IAS AC472 Part A (fabrication) at the plant and Part C (design) at the design office, with Smith-Emery Laboratories conducting the periodic plant inspections. Add it to your submittal, then confirm the status in the IAS online directory.
IAS renews AC472 only after the year's audits are closed. Each certificate below is one renewal, program number MB-268. The full story is on the IAS AC472 page.
Certificates & accreditations
Certificates & accreditations
World Steel's quality management system, audited and found to conform to ISO 9001:2015. Certified since September 2023.
PDF · 327 KB · 1 page · English
Certificates & accreditations
World Steel's environmental management system, audited and found to conform to ISO 14001:2015. Certified since September 2023.
PDF · 337 KB · 1 page · English
Certificates & accreditations
World Steel's occupational health and safety system, audited to ISO 45001:2018. Certified since September 2023.
PDF · 331 KB · 1 page · English
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.