What you get
Four records, tied to every piece
Why it pays
An inspection that starts with clean paperwork
Ready for inspection
Records in one place.
Traceable
By piece mark.
Fewer delays
No hunting for paperwork.
Accredited shop
IAS AC472, audited twice a year.
| Our records | Shop primer records and DFT readings |
|---|---|
| Traceability | By piece mark |
| Ratings | Per IBC Chapter 7 |
| Thickness check | Against the ASTM E119 or UL 263 listed assembly |
| Field readings | Taken and recorded by your special inspector |
| Report | Your special inspector reports to the building official |
Photo
PhotoHow it works
Measured in the shop, sent with the steel
- Primer appliedIn our paint shop.
- DFT measuredAnd recorded.
- Records compiledBy piece mark.
- Sent with the steelFor your inspector.
Questions
Documentation questions
Do you inspect the fire protection on site?
No. Your special inspector takes and records the field readings for the final protection layer and reports to the building official. We document our shop part of the work.
What format are the records in?
Digital records by piece mark, sent with the shipment and available in PEB Studio.
Is this only for fire protection?
The same shop records support any coating inspection; see Coating Inspection.
Who applies the coatings behind these records?
Our own painters, trained and certified by the paint manufacturer, using coating products that carry UL certification. The records show what they applied and the thickness they reached.
More optional add-ons: Cementitious Fireproofing · Fire Protection Specification Support · Coating Compatibility Review · Cable Tray Supports
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Fire Protection Inspection Documentation
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions