Where
Ceiba, on Puerto Rico’s east coast, facing Vieques and Culebra.
Since 1943
How the base is changing, from public reports. Dates ahead are the plans reported in 2026.
The US Navy opens Roosevelt Roads at Ceiba.
Military use ends.
About 3,307 acres transferred in total.
Water, wastewater and power works planned.
Sources: El Nuevo Día (2025), Metro (2025), San Juan Daily Star (March and July 2026).
Site profile
What 2025 and 2026 press reports say about the site.
Ceiba, on Puerto Rico’s east coast, facing Vieques and Culebra.
About 3,307 acres transferred by the Navy; about 3,302 developable acres held by the Ports Authority.
The Local Redevelopment Authority and the Puerto Rico Ports Authority.
A Coast Guard pier being rebuilt and a dry dock awaiting revival.
Sources: San Juan Daily Star (March and July 2026). Plans change; check parcels and leases with the redevelopment authority.
Buildings
Uses named in 2025 and 2026 reports, each linked to the World Steel product or package behind it.
Air cargo plans
Long spans for cargo and aircraft at the airfield.
Long-span steel structuresPort and airfield
Clear-span stores for goods moving by sea and air.
Warehouse buildingsPier and dry dock
Halls with crane bays for ship repair work.
Manufacturing plantsBlue economy
Frames for labs and offices beside the sea.
Multi-storey steel framingSea air and storms
Buildings on the old base sit within reach of salt spray and in the hurricane belt. Your engineer sets the wind and seismic basis and the exposure class; we design to it and supply coating systems or hot-dip galvanizing to match.
Getting steel there
On CIF San Juan our steel lands at the island’s main port. Your broker clears it and trucks carry it east to Ceiba. Bundles are labelled by building and area so a crew can unload in erection order, even on a large, open site.
From our plant
Real World Steel photos from our plant in Vietnam. None is shown as a Roosevelt Roads site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Puerto Rico industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
At Ceiba on Puerto Rico’s east coast. It was a US naval station from 1943 to 2004.
It is being redeveloped. Public reports in 2026 describe about 3,307 acres transferred by the Navy and water, wastewater and power works planned from late 2026. Check parcels with the redevelopment authority.
Reports name air cargo, a rebuilt Coast Guard pier, a dry dock, marine research, tourism and a space launch site.
Yes. Your engineer sets the exposure; we supply a matching coating system or hot-dip galvanized members.
No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.
By sea to San Juan, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then east by road. We supply FOB Vietnam or CIF San Juan.
Send the parcel, the use and your engineer’s code basis. We design, fabricate and ship CIF San Juan.