Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Puerto Rico industrial estates · Foreign-Trade Zone 7

Steel buildings for Foreign-Trade Zone 7 and PRIDCO parks

Foreign-Trade Zone 7 was approved in 1960 with PRIDCO, Puerto Rico’s industrial development company, as grantee. Its sites run across the island, from the San Juan Industrial Park to distribution centres, with subzones at plants of Lilly del Caribe, Amgen, AbbVie and other drug makers. PRIDCO itself holds more than 760 industrial lots. Pharma, device and distribution tenants need plant halls and stores built to tight specs. We design them to your engineer’s code basis, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them CIF San Juan.

FTZ 7, from public reports

1960
zone approved
263.6 acres
activated, US ITA
760+
PRIDCO industrial lots

2,500 t a month of structural steel from our own plant, FOB Vietnam or CIF San Juan.

Zone profile

Foreign-Trade Zone 7 at a glance

What the US International Trade Administration and PRIDCO publish about the zone and its parks.

US ITA

Grantee

Puerto Rico Industrial Development Company (PRIDCO); port of entry San Juan.

US ITA

Sites

263.6 activated acres across island-wide sites, including San Juan Industrial Park and Amelia Industrial Park.

US ITA

Subzones

Plants of Lilly del Caribe, Amgen, AbbVie, Patheon, Neolpharma and others.

PRIDCO

PRIDCO portfolio

More than 760 industrial lots and over 21.5 million sq ft built.

Sources: US International Trade Administration, FTZ 7 zone details; PRIDCO. Check sites and leases with PRIDCO.

Since 1942

Eight decades of industrial parks in Puerto Rico

How the zone and its parks grew, from public sources.

  1. 1942

    PRIDCO founded

    The island’s industrial development company is set up.

  2. 1960

    FTZ 7 approved

    PRIDCO becomes grantee of the zone.

  3. 2025

    3.3% vacancy

    San Juan industrial space is nearly full, JLL reports.

  4. 2026

    New portfolio

    PRIDCO presents ready-to-fit buildings and new construction.

Sources: PRIDCO (2026), US ITA, JLL (2H 2025).

Pharma plants

Steel for regulated plants

Drug and device plants carry clean rooms, heavy air handling and piping. We design the frame, roof and plant decks for those loads, keep deflection to the limits your engineer sets and detail steel that is easy to clean.

  • Roof steel for air handling units
  • Plant decks and interstitial floors
  • Deflection limits set with your engineer
  • Smooth, cleanable coating finishes

Building sizes

From a small PRIDCO unit to a full plant

PRIDCO lists sites from about 2,000 sq ft to over 1,000,000 sq ft. These illustrative sizes show the range; we set the real one to your lot and your engineer’s basis.

Light industrial unit

24 m × 48 m (79 × 157 ft)

1,150 m² with a dock door

Device plant

48 m × 120 m (157 × 394 ft)

5,760 m² with a plant mezzanine

Distribution centre

72 m × 168 m (236 × 551 ft)

12,100 m² with docks on two sides

Port of San Juan

One port of entry for the whole zone

FTZ 7’s port of entry is San Juan. On CIF San Juan our steel lands there, your broker clears it and trucks carry it to the zone site or PRIDCO park. Bundles are labelled by building and area so a crew can unload in erection order.

Port of entrySan Juanfor Foreign-Trade Zone 7 (US ITA)
Sea time≈45 daysVietnamese port to San Juan, typical sailing, confirmed at booking
Plant to port≈2 hby road from our plant to the Vietnamese port
Ports3San Juan, Ponce and Mayagüez

From our plant

Inspection, members, coating and packing

Real World Steel photos from our plant and projects in Vietnam. None is shown as a Puerto Rico site.

1
1
1
1

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any Puerto Rico estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel buildings in Foreign-Trade Zone 7

What is Foreign-Trade Zone 7?

A US foreign-trade zone approved in 1960 with PRIDCO as grantee and San Juan as port of entry, with sites and subzones across Puerto Rico, according to the US International Trade Administration.

Which companies have subzones?

The ITA lists subzones at plants of Lilly del Caribe, Amgen, AbbVie, Patheon, Neolpharma and others.

How big are PRIDCO sites?

PRIDCO lists sites from about 2,000 sq ft to over 1,000,000 sq ft, across more than 760 industrial lots. Check availability with PRIDCO.

Can you design for pharma plants?

Yes. We design the frame, roof and plant decks for air handling and piping loads; clean-room fit-out is done by your specialist.

Do you erect the buildings?

No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.

How does steel reach the zone?

By sea to San Juan, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking. We supply FOB Vietnam or CIF San Juan.

Building in FTZ 7 or a PRIDCO park?

Send the lot, the use and your engineer’s code basis. We design, fabricate and ship CIF San Juan.