Puerto Rico industrial estates · Aguadilla aerospace cluster

Steel hangars and buildings for the Aguadilla aerospace cluster

Aguadilla’s Rafael Hernández Airport has an 11,702 ft runway, the longest in the Caribbean, and around it has grown Puerto Rico’s aerospace cluster. Lufthansa Technik runs an aircraft maintenance base there with more than 300 staff and five production lines, and Honeywell, Pratt & Whitney and Lockheed Martin have facilities nearby. Hangars and shops need long clear spans. We design them to your engineer’s code basis, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them CIF San Juan.

Aguadilla, from public reports

11,702 ft
runway, longest in the Caribbean
300+
staff at Lufthansa Technik PR (2022)
5
MRO production lines

2,500 t a month of structural steel from our own plant, FOB Vietnam or CIF San Juan.

Cluster profile

The Aguadilla cluster at a glance

What 2022 and 2026 public reports say about the airport and its tenants.

InvestPR, 2026

Runway

11,702 ft at Rafael Hernández Airport, the longest in the Caribbean.

Aviation Week, 2022

MRO base

Lufthansa Technik Puerto Rico: more than 300 staff and five production lines.

Aviation Week, 2022

Neighbours

Honeywell, Pratt & Whitney and Lockheed Martin facilities nearby.

InvestPR, 2026

Sector

Over 8,200 aerospace jobs added in Puerto Rico over five years.

Sources: InvestPR aerospace page (2026), Aviation Week (15 August 2022). Check land and leases with the airport and site owners.

Hangar sizes

Hangars and shops sized for narrowbody work

Illustrative sizes. We set the real building to the aircraft, the door and your engineer’s basis.

Narrowbody hangar

60 m × 54 m (197 × 177 ft)

3,240 m², one A320-family bay

Component shop

30 m × 72 m (98 × 236 ft)

2,160 m² with a crane bay

Parts store

36 m × 60 m (118 × 197 ft)

2,160 m² with racking

Buildings

What the aerospace cluster builds

Each building type links to the World Steel product or package behind it.

Engine and component shops

Halls with crane runways for engines and parts.

Crane runway beams

Hangar doors

Long spans and big doors in a hurricane zone

A hangar door is the weakest wall in a storm. Your engineer sets the wind and seismic basis; we design the door header truss, the side frames and the roof bracing to carry the door loads with the doors open or shut.

  • Door header trusses to your wind basis
  • Seismic basis set by your engineer
  • Deflection limits for door tracks
  • Coatings for coastal air

Delivery

From the Vietnamese port to the north-west

Our CIF terms land the steel at San Juan. From there it runs west along the north coast to Aguadilla, so long truss pieces are cut at bolted splices to fit the trucks.

  1. Our plantPacked in erection order
  2. At seaAbout 45 days to San Juan, typical sailing
  3. San JuanCleared by your broker
  4. West by roadAlong the north coast
  5. AguadillaUnloaded at the apron plot

From our plant

Arched trusses, long spans and crane columns

Real World Steel photos from our plant and projects in Vietnam and the region. None is shown as an Aguadilla site.

1
1
1
1

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any Puerto Rico estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel hangars in the Aguadilla aerospace cluster

Where is the Aguadilla aerospace cluster?

Around Rafael Hernández Airport at Aguadilla in north-west Puerto Rico, whose 11,702 ft runway is the longest in the Caribbean, according to InvestPR.

Who works there?

Lufthansa Technik runs an aircraft maintenance base with more than 300 staff (2022), and Honeywell, Pratt & Whitney and Lockheed Martin have facilities nearby.

Can you make hangars?

Yes. We design and fabricate long-span hangars, door header trusses, engine shops with crane runways and parts stores.

Do you design for hurricanes?

Yes. Your engineer of record sets the wind and seismic basis; we design the frame and the hangar door structure to it.

Do you erect the buildings?

No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.

How does steel reach Aguadilla?

By sea to San Juan, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then west by road. We supply FOB Vietnam or CIF San Juan.

Building in the Aguadilla aerospace cluster?

Send the plot, the aircraft and your engineer’s code basis. We design, fabricate and ship CIF San Juan.