Large-project capacity
Long-span sheds for a whole terminal, from one plant
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
Breakbulk
Coils, pipe and project cargo wait under a crane
Breakbulk cargo is lifted, not pushed. The store is a crane bay with doors at both ends.
Crane bays for coils and pipe
A bridge crane runs the length of the store so coils, pipe and plate are lifted from truck to stack without a forklift.
Wide doors at both ends
Trucks and port trailers drive through, loaded under the crane and out the other side.
Heavy floors, clear spans
Stacks of coils load the slab hard. Columns stay out of the stacking area so the crane covers it all.
From our project files
Large warehouses and long spans, shipped by sea
Hope Valley in Western Australia took about 350 t of our steel for a warehouse and office. Long-span curved frames, and warehouses in Indonesia, the Philippines and Myanmar, all left our plant by sea, packed and marked the way a terminal shed would be. We have no bulk terminal reference yet.
Photo
Photo
Photo
Photo
Scope, in writing
What we supply and what stays with your team
World Steel, our plant in Vietnam
- Long-span frame, crane runway, conveyor opening and walkway steel designed to the contract documents
- Coating systems for the cargo and the salt air, from high-build paint to galvanizing and duplex
- Shop and erection drawings at no extra cost, ready for your Engineer of Record
- Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio
The US contractor, our customer
- Drawing approval, the PE seal and the permit with your Engineer of Record
- Push walls, slabs, conveyors, cranes and dust or explosion protection
- Port authority and environmental approvals
- Erection, cladding and fit-out
Questions from US contractors
Bulk and breakbulk storage steel: questions and answers
6 answers, grouped by topic.
Bulk sheds 3 answers
Does the steel frame take the pile pressure?
Usually not. Concrete push walls by others take the pile, and the steel frame stands above or behind them. Where the frame does take load, the design team gives the pressure.
How do you protect steel from salt or fertilizer?
By keeping it above the pile, avoiding ledges where cargo settles, and using the coating system the design team sets, often duplex or high-build epoxy.
Can the roof carry a conveyor gallery?
Yes, when the conveyor supplier gives the loads and the opening sizes. The gallery supports and tripper openings are framed with the roof.
Breakbulk and scale 3 answers
Can a breakbulk store have a crane for coils?
Yes. A bridge crane is designed with the frame, using the crane maker’s capacity and wheel loads, with columns kept clear of the stacking area.
How long can a bulk shed span?
As long as the cargo needs: long clear spans are routine for our rigid frames and trusses, and the span is set with the Engineer of Record.
Do you have bulk terminal references?
Not a bulk terminal yet. Our references are large warehouses and long-span frames, such as Hope Valley in Western Australia, about 350 t.
Keep reading
Related pages
Price it or partner with us
Send the cargo, the pile and the crane.
Share the cargoes, pile heights, push walls, conveyors and crane capacity. We will price the long-span frame, the crane runways and the coating.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833