Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Marine repair and shipyard support

Marine repair shops: a door as tall as the boat

A vessel comes out of the water in a travel lift and rolls into the hall still in its slings, mast or wheelhouse and all. The door, the crane hook and the bay are sized around that moment, and the shops behind keep the work going. Our plant fabricates 2,500 t of structural steel a month, so a yard’s repair halls, stores and offices can run as one order.

DOOR CLEARS THE MAST CRANE TRAVEL LIFT REPAIR BAY WATER

Large-project capacity

A yard’s halls, stores and office, from one plant

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

From the water to the bay

Where the boat goes, and what the steel does at each stop

  1. Haul-out

    The travel lift runs on its own piers by the water. The building starts where its path ends, so the door and the floor line are set from the lift’s dimensions.

    Industrial overhead doors →
  2. Wash-down

    A wash pad outside the door, often under a canopy, with drainage to the treatment system the environmental engineer sets.

    Steel canopies →
  3. The repair bay

    A tall clear-span bay with an overhead crane for engines and shafts, and doors high enough for the vessel in the slings.

    Crane supporting structures →
  4. Blast and paint hall

    An enclosed hall with ventilation openings and access platforms around the hull. Ventilation, filters and fire protection are by others.

    Access walkways →

Shipyard support buildings

The shops that keep the bay busy

Along the yard, smaller buildings do the work that does not need the boat: engines, fabrication, stores and the office. They share the frame system and the coating of the main hall.

Workshop buildings with office

Engine and machine shop

A crane or monorail over the benches and a floor rated for heavy parts.

Fabrication and welding

Plate and pipe work with fume extraction openings framed in the roof.

Stores and chandlery

Racking and a mezzanine for spares, with a counter to the yard.

Yard office

A two-storey office with a view over the yard and the water.

From our project files

Workshops by the coast, steel for an island

Syncro Engineering’s workshop and office buildings in Western Australia took more than 140 t of our steel in 2022. The UR warehouse on Guam was fabricated, coated and shipped from our plant to an island site in salt air. We have no shipyard reference yet.

See the Syncro project
Rendering of the Syncro workshop and office buildings with trucks in front 3D model
Rendering of the Syncro workshop frame and the clad building beside it 3D model
Long painted rafters with end plates for the UR warehouse on Guam in the World Steel plant Photo
Painted members stacked and ready to ship to Guam Photo

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Hall frame, crane runway, door header, canopy and platform steel designed to the contract documents
  • Coating systems for salt air, from paint to galvanizing and duplex, to the system the design team sets
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Travel lift piers, slipways, wash water treatment and environmental permits
  • Cranes, doors, paint hall ventilation and fire protection
  • Erection, slabs and fit-out

Questions from US contractors

Marine repair and shipyard building steel: questions and answers

6 answers, grouped by topic.

Repair halls 3 answers

How tall does the door of a boat repair hall need to be?

Tall enough for the largest vessel in the travel lift slings, with its mast or wheelhouse. The yard gives the vessel and lift sizes and the door maker sets the opening; we design the header and the frame around it.

Can the hall carry an overhead crane?

Yes. A bridge crane or monorail over the bay is designed with the frame, using the crane maker’s capacity and wheel loads.

Can you build an enclosed blasting and painting hall?

Yes, we design and fabricate the steel enclosure and access platforms. Ventilation, filtration and fire protection are designed by others.

Yards and the coast 3 answers

How is the steel protected from salt air?

With the coating system the design team sets for the site, often a high-build paint, hot-dip galvanizing by an outside galvanizer in Vietnam, or both.

Can one order cover the halls, stores and yard office?

Yes. The plant fabricates 2,500 t of structural steel a month, so a yard’s buildings can ship together, marked by building and erection area.

Do you have shipyard references?

No shipyard so far. Our references are workshops with offices, such as Syncro Engineering in Western Australia, more than 140 t, and the UR warehouse for an island site on Guam.

Keep reading

Related pages

Price it or partner with us

Send the vessel sizes and the yard plan.

Share the largest vessel, the travel lift and crane sizes and the shops you need. We will price the halls, the crane runways and the yard buildings.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details