Container freight station
Dock doors on both long walls for stuffing and stripping containers, and a clear span for forklifts and reach stackers.
Loading dock canopies →Large-project capacity
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
On the terminal
Dock doors on both long walls for stuffing and stripping containers, and a clear span for forklifts and reach stackers.
Loading dock canopies →Cages and walls inside the shell for goods held for customs, framed into the building grid.
Steel mezzanine frames →Open sites on the coast see high wind. The frame, girts and cladding fixings are designed for the wind speed the design team sets.
Wall girts →Gutters sized for coastal storms and a base detail that keeps steel out of standing water.
Gutters →
Photo
Photo
Photo
Photo
From our project files
In 2025 we fabricated steel for a port facility structure for PSA in Singapore, steel that will stand in salt air every day. On Guam, the UR warehouse was designed, fabricated and shipped from our plant for an island site with the same exposure.
Scope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
6 answers, grouped by topic.
It depends on how close it stands to the water. The design team sets the corrosivity category, often C4 or C5 under ISO 12944, and the coating system, which is applied in Vietnam before the steel ships.
Yes. Members can be galvanized by an outside galvanizer in Vietnam, painted, or both (a duplex system) before they ship. Bolts and fasteners are chosen to match.
The US contractor, our customer, repairs damage from handling and erection with the touch-up system named in the coating specification.
Yes. Container freight stations often have doors on both long walls, with canopies, and a clear span for forklifts and reach stackers.
The plant fabricates 2,500 t of structural steel a month, so a terminal’s transit sheds, freight station and canopies can run as one order shipped by building.
Yes. We fabricated steel for a port facility structure for PSA in Singapore in 2025, and supplied the UR warehouse on Guam, an island site in salt air.
Keep reading
Price it or partner with us
Share where each building stands, the door list and the coating specification. We will price the frames, the canopies and the coating system.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833