What frames it
Four parts around every opening
- HeaderCarries the wall above the opening.
- JambsFrame the sides and take the wind.
- SillSupports the unit and sheds water.
- FlashingsSeal the opening to the wall panels.
Why it matters
Designed in, not cut in
No cutting on site
Girts are laid out around the opening.
Strong around the hole
Jambs and header sized for wind.
Sealed
Flashings drawn and folded to fit.
Ships with the walls
Framing and trims together.
How it is done
Equipment data to framed opening
- Equipment dataRough openings from the unit makers.
- Opening framedIn the wall design and elevations.
- FabricatedFraming and flashings made and labeled.
Specification
Framed openings at a glance
- Framing
- Cold-formed jambs, header and sill, or hot-rolled where loads need it
- Size
- From the fan, louver or vent maker’s rough opening
- Loads
- Wind on the opening and the weight of the unit
- Flashings
- Head, jamb and sill flashings from matching coil
- Coordination
- Opening sizes agreed with your mechanical designer
- Design basis
- AISI S100 and ASCE 7-22
Photo
PhotoWhere it goes
Buildings that move a lot of air
Questions
Ventilation opening questions
What do you need to frame an opening?
The rough opening size and weight of the louver, fan or vent, and where it goes on the wall.
Can openings be added after design?
Yes, before shop drawings are approved. After that, changes are possible but may affect fabricated girts.
Do you supply the fans?
Fans are usually by others. We frame the opening and flash it; louvers are in our catalog.
More walls and cladding: Metal Wall Cladding · Insulated Metal Panels · Single-Skin Wall Panels · Wall Insulation · Wall Flashings · Corner Trims · Louvers · Wall Accessories
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Ventilation Openings
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides