Two ways to supply
Bolted sets or welded runs
Right height
Set by the rule that applies.
Strong enough
Designed for code loads.
Continuous
Along the whole flight.
Shipped with the stair
No separate supplier.
How it is planned
With the stairs and walkways
- Rules confirmedIBC or OSHA.
- Runs drawnWith stairs and walkways.
- Shipped as setsMarked by run.
Specification
Handrails at a glance
- Profile
- Round tube or pipe, sized for grip
- Loads
- Designed to the IBC or OSHA 1910 Subpart D, such as 890 N (200 lb) on the top rail
- Height
- Per the rule that applies, set on the drawings
- Supply
- Modular bolted sets or shop-welded runs
- Fixing
- Bolted to stringers, beams or posts
- Finish
- Galvanized, painted or safety yellow
Photo
PhotoQuestions
Handrail questions
Handrail or guardrail, what is the difference?
A handrail is what you hold on a stair or ramp. A guardrail stops people falling off an open edge. Many stairs need both; we design them together.
Bolted or welded?
Bolted modular rails are quick and adjustable on site; shop-welded rails are cleaner and stiffer. Both are designed for code loads.
Can they be painted safety yellow?
Yes, in a paint system suited to the environment, or galvanized and then painted.
More mezzanines and floors: Steel Mezzanine Frames · Composite Floor Support Steel · Metal Decking · Steel Platforms · Equipment Floors · Access Walkways · Industrial Floor Support Structures · Stairs
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Handrails
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions