Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Exuma · Island group

Steel buildings and structural steel for Exuma, the Bahamas

Exuma is a chain of more than 360 cays, from the resorts and harbour of George Town on Great Exuma to the yachting cays and the remote Ragged Island to the south.

Central islands · Island group · Main settlement George Town

Site conditions in Exuma

What the site asks of your steel

Wind
Full hurricane exposure
Air
Spray on every cay
Surge
Low cays
Access
Freight boat

Our design note. Exuma builds resorts, marinas and airport buildings on low cays. We design for full exposure, galvanize where spray reaches and pack for barge and boat.

Exuma at a glance

The ground, the work and the road in

Ground and climate

Low limestone and sand cays around shallow turquoise banks.

What gets built

Resorts, yachting and marinas, tourism, fishing and public services.

Getting steel there

By freight boat from Nassau to George Town; international airport at Moss Town.

Towns: George Town · Rolleville · Staniel Cay · Black Point · Ragged Island

Steel we recommend

What we fabricate for Exuma

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Resorts and hotels

Multi-storey hotel frames, long-span lobbies, villas and back-of-house buildings.

Multi-story steel buildings →

Marinas and dock buildings

Boat sheds, dock warehouses and marina service buildings.

Hurricane coast steel buildings →

Hangars and terminals

Long-span frames for airport terminals, hangars and cargo sheds.

Aircraft hangar buildings →

Contractors in Exuma

You win the job in Exuma. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Exuma

Can you supply resort and marina steel in Exuma?

Yes. Hotel frames, villas, boat sheds and service buildings, packed for freight boat delivery.

Can you supply airport buildings?

Yes. Terminals, hangars and cargo sheds with long-span frames.

Central islands

Other central islands

New Providence and Nassau, Andros, Eleuthera, Exuma and Cat Island.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in the Bahamas. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · The Bahamas

Talk to us about steel for Exuma

Send the drawings or the site, size and use. We design or detail the steel for Exuma’s hurricane, storm-surge and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Nassau. WhatsApp, email or a video call with our engineers, booked at an hour that suits Nassau. Our contact page for the Bahamas has the ports, the local time and the form.