Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Abaco · Island group

Steel buildings and structural steel for Abaco, the Bahamas

Abaco and its cays are the boating capital of The Bahamas, and the islands Dorian hit hardest in 2019. Marsh Harbour, Treasure Cay and Hope Town are still rebuilding, this time stronger.

Northern islands · Island group · Main settlement Marsh Harbour

Site conditions in Abaco

What the site asks of your steel

Wind
Dorian’s Category 5 path
Surge
Several metres in 2019
Air
Marina salt
Access
Freight boat

Our design note. Abaco is rebuilding schools, clinics, marinas and homes to survive the next Dorian. Steel frames with raised floors, protected openings and galvanized bases fit the brief.

Abaco at a glance

The ground, the work and the road in

Ground and climate

Low limestone and pine forest, with mangrove and marsh on the west; the cays are sand and rock barely above the sea.

What gets built

Boating and marinas, tourism, fishing, construction and public services.

Getting steel there

By freight boat from Nassau or Freeport to Marsh Harbour; Abaco has its own airport at Marsh Harbour.

Towns: Marsh Harbour · Treasure Cay · Hope Town · Coopers Town · Sandy Point

Steel we recommend

What we fabricate for Abaco

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Schools, clinics and shelters

Schools, clinics and community halls designed to serve as hurricane shelters.

Sports facilities and arenas →

Marinas and dock buildings

Boat sheds, dock warehouses and marina service buildings.

Hurricane coast steel buildings →

Resorts and hotels

Multi-storey hotel frames, long-span lobbies, villas and back-of-house buildings.

Multi-story steel buildings →

Contractors in Abaco

You win the job in Abaco. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Abaco

Can you supply rebuilding projects in Abaco?

Yes. Schools, clinics, marina buildings and commercial frames, designed for the wind and surge your engineer sets and shipped by freight boat.

How do you get steel to Marsh Harbour?

Through Nassau or Freeport, then by freight boat, with bundles sized for the boat and the dock.

Northern islands

Other northern islands

Grand Bahama, Abaco, Bimini and the Berry Islands, closest to Florida and hit hardest by Dorian.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in the Bahamas. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · The Bahamas

Talk to us about steel for Abaco

Send the drawings or the site, size and use. We design or detail the steel for Abaco’s hurricane, storm-surge and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Freeport. WhatsApp, email or a video call with our engineers, booked at an hour that suits Nassau. Our contact page for the Bahamas has the ports, the local time and the form.