Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Andros · Island

Steel buildings and structural steel for Andros, the Bahamas

Andros is the largest island in The Bahamas, bigger than all the others together but thinly settled: pine forest, blue holes, creeks, the third-largest barrier reef in the world and the freshwater wellfields that help supply Nassau.

Central islands · Island · Main settlement Fresh Creek

Site conditions in Andros

What the site asks of your steel

Wind
Full hurricane exposure
Ground
Low, wet in the west
Air
Salt on the coast
Access
Freight boat

Our design note. Andros needs schools, clinics, water works and lodges spread over a huge, low island. Light steel frames, raised floors and boat-sized bundles fit the logistics.

Andros at a glance

The ground, the work and the road in

Ground and climate

Low limestone with pine forest on the east, vast creeks, mangrove and tidal flats on the west.

What gets built

Fishing and bonefishing lodges, farming, water supply, public services and small communities.

Getting steel there

By freight boat from Nassau to Nicholls Town, Fresh Creek or Congo Town; several airports.

Towns: Nicholls Town · Fresh Creek · Andros Town · Mangrove Cay · Congo Town

Steel we recommend

What we fabricate for Andros

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Schools, clinics and shelters

Schools, clinics and community halls designed to serve as hurricane shelters.

Sports facilities and arenas →

Energy and utilities

Power plant buildings, solar canopies, tank and pipe supports, desalination plants.

Energy and power utilities →

Agricultural buildings

Farm stores, packing houses and agro-processing sheds.

Agricultural steel buildings →

Contractors in Andros

You win the job in Andros. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Andros

Can you supply water works on Andros?

Yes. Pump houses, plant buildings and tank supports, coated for the salt air.

How does steel reach Andros?

By freight boat from Nassau to the main settlements, with bundles sized for each dock.

Central islands

Other central islands

New Providence and Nassau, Andros, Eleuthera, Exuma and Cat Island.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in the Bahamas. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · The Bahamas

Talk to us about steel for Andros

Send the drawings or the site, size and use. We design or detail the steel for Andros’s hurricane, storm-surge and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Nassau. WhatsApp, email or a video call with our engineers, booked at an hour that suits Nassau. Our contact page for the Bahamas has the ports, the local time and the form.