Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

New Providence · Island

Steel buildings and structural steel for New Providence, the Bahamas

New Providence is small but holds most Bahamians: Nassau, the capital, the cruise and container ports, the international airport and the big resorts of Paradise Island and Cable Beach.

Central islands · Island · Main settlement Nassau

Site conditions in New Providence

What the site asks of your steel

Wind
Full hurricane exposure
Surge
Low coasts and harbour
Air
Salt on every side
Site
Busy Nassau traffic

Our design note. New Providence projects range from resort towers to port warehouses. All need full hurricane design, marine coatings near the shore and deliveries planned around Nassau traffic.

New Providence at a glance

The ground, the work and the road in

Ground and climate

Low limestone ridges with lakes and wetlands between them; coastal flats and fill along the harbour.

What gets built

Tourism, government, finance, the ports and airport, retail, warehouses and housing.

Getting steel there

The Nassau Container Port at Arawak Cay is on the island; most sites are under an hour away.

Towns: Nassau · Paradise Island · Cable Beach · Carmichael · Lyford Cay

Steel we recommend

What we fabricate for New Providence

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Resorts and hotels

Multi-storey hotel frames, long-span lobbies, villas and back-of-house buildings.

Multi-story steel buildings →

Warehouses and logistics

Clear-span warehouses and distribution centers built to ride out storms.

Warehouse and distribution buildings →

Multi-storey buildings

Steel frames with composite deck for offices, clinics and apartments.

Multi-storey steel framing →

Contractors in New Providence

You win the job in New Providence. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in New Providence

Can you supply resort steel in Nassau?

Yes. Hotel frames, lobbies and back-of-house buildings, shipped to the Nassau Container Port next door.

Do Nassau warehouses need special design?

They need full hurricane design and surge-aware floor levels on low ground, set by your engineer.

Central islands

Other central islands

New Providence and Nassau, Andros, Eleuthera, Exuma and Cat Island.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in the Bahamas. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · The Bahamas

Talk to us about steel for New Providence

Send the drawings or the site, size and use. We design or detail the steel for New Providence’s hurricane, storm-surge and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Nassau. WhatsApp, email or a video call with our engineers, booked at an hour that suits Nassau. Our contact page for the Bahamas has the ports, the local time and the form.