Land
37.2 acres, the largest of the seven ISL estates.
Estate profile
What the Invest Saint Lucia portfolio says about the estate.
37.2 acres, the largest of the seven ISL estates.
Four factory shells, split into eight units.
About half the units let, as the portfolio states.
Odsan, in the Castries district, a free-zone estate.
Source: Invest Saint Lucia asset portfolio (undated). Check lots, units and leases with Invest Saint Lucia.
Shell sizes
Illustrative sizes. We set the real building to your lot, your process and your engineer’s basis.
30 m × 60 m (98 × 197 ft)
1,800 m² with a loading bay
24 m × 72 m (79 × 236 ft)
4 units of 432 m² each
24 m × 48 m (79 × 157 ft)
1,152 m² with racking
Buildings
Each building type links to the World Steel product or package behind it.
Single or multi-unit shells for light industry.
Manufacturing plantsClear-span stores for goods held in the free zone.
Warehouse buildingsSteel mezzanines to add offices inside a unit.
Steel mezzanine framesTwo-storey steel frames for front offices.
Multi-storey steel framingHills and storms
Saint Lucia is volcanic and steep, and it sits in the hurricane belt. Your engineer sets the wind and seismic basis and the ground design; we design the frame, bracing and cladding fixings to it.
Delivery
Our CIF terms land the steel at Castries. Odsan lies in the same district, so the run by road is short.
From our plant
Real World Steel photos from our plant and projects in Vietnam. None is shown as an Odsan site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Saint Lucia industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
At Odsan in the Castries district of Saint Lucia. It is a free-zone estate run by Invest Saint Lucia.
37.2 acres, the largest of the seven Invest Saint Lucia estates, with four factory shells split into eight units, according to the ISL portfolio.
Yes. We design and fabricate single-tenant factories, multi-unit shells and stores for the lot you hold; Invest Saint Lucia handles the lease.
Yes. Your engineer of record sets the wind and seismic basis; we design the frame and connections to it.
No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.
By sea to Castries, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then a short run by road. We supply FOB Vietnam or CIF Castries.
Send the lot, the use and your engineer’s code basis. We design, fabricate and ship CIF Castries.