Processing halls
Clear halls with smooth walls that wash down easily.
Manufacturing plantsEstate story
What 2019 government news and the ISL portfolio say about Dennery.
Four factory shells, about three-quarters let.
ISL spends EC$1.4 million retrofitting an old shell on a long lease.
Caribbean Quality Meats invests EC$4.3 million in a poultry plant.
About 30 people expected to work there at first.
Sources: Government of Saint Lucia news (20 November 2019), Invest Saint Lucia asset portfolio (undated).
Buildings
Each building type links to the World Steel product or package behind it.
Clear halls with smooth walls that wash down easily.
Manufacturing plantsChillers and freezers inside a steel frame.
Cold storage buildingsStores for feed, packaging and dry goods.
Warehouse buildingsPlatforms for equipment, offices and viewing.
Steel mezzanine framesHygiene and storms
A food plant needs a frame that is easy to keep clean and a building that holds in a storm on the Atlantic coast. Your engineer sets the wind and seismic basis; we design the frame and pick coatings that suit wash-down and salt air.
Delivery
Our CIF terms land the steel at Castries. From there it runs across the island to the east coast by road.
From our plant
Real World Steel photos from our plant and projects in Vietnam. None is shown as a Dennery site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Saint Lucia industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
At Dennery on the east coast of Saint Lucia. It is run by Invest Saint Lucia and has four factory shells on 2.1 acres.
In 2019 Invest Saint Lucia retrofitted an old shell for Caribbean Quality Meats, a poultry processing plant investing EC$4.3 million, according to government news.
Yes. We design and fabricate processing halls, cold room frames, dry stores and mezzanines for food makers.
Yes. Your engineer of record sets the wind and seismic basis; we design the frame and cladding fixings to it.
No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.
By sea to Castries, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then across the island by road. We supply FOB Vietnam or CIF Castries.
Send the lot, the use and your engineer’s code basis. We design, fabricate and ship CIF Castries.