Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Saint Lucia industrial estates · Vieux Fort Free Zone

Steel warehouses and shells for the Vieux Fort Free Zone

The Vieux Fort Free Zone is a 12.7-acre Invest Saint Lucia estate on the island’s south coast, in the town that holds Hewanorra International Airport and the southern port. Its five factory shells are mostly let, and new tenants often need a building of their own. We design it to your engineer’s code basis, fabricate it in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship it CIF Saint Lucia.

Vieux Fort FZ, from public reports

12.7 acres
free-zone land, ISL
5 shells
factory buildings
60%
occupied, ISL portfolio

2,500 t a month of structural steel from our own plant, FOB Vietnam or CIF Castries.

Buildings

What south-coast free-zone tenants build

Each building type links to the World Steel product or package behind it.

Building sizes

Buildings sized for a Vieux Fort lot

Illustrative sizes. We set the real building to your lot, your use and your engineer’s basis.

Distribution store

30 m × 54 m (98 × 177 ft)

1,620 m² with dock doors

Two-unit shell

24 m × 48 m (79 × 157 ft)

2 units of 576 m² each

Cold store

18 m × 30 m (59 × 98 ft)

540 m² insulated rooms

Zone profile

Vieux Fort’s free zones at a glance

What the Invest Saint Lucia portfolio says about the south-coast estates.

ISL portfolio

Vieux Fort Free Zone

12.7 acres, five factory shells, about 60% let.

ISL portfolio

Hewanorra Free Zone

9.0 acres, four shells with ten units, most of them free.

ISL portfolio

Vieux Fort Industrial Estate

2.1 acres, three factory shells.

ISL portfolio

Together

About 24 acres of estate land in Vieux Fort.

Source: Invest Saint Lucia asset portfolio (undated). Occupancy as the portfolio states it; check lots and leases with Invest Saint Lucia.

Wind and salt

Built for the south coast’s wind and salt

Vieux Fort faces open water at the southern tip of the island, in the hurricane belt. Your engineer sets the wind and seismic basis; we design the frame, doors and cladding fixings to it and pick coatings for salt air.

  • Frames and cladding to your wind basis
  • Seismic basis set by your engineer
  • Coatings for salt air and rain
  • Wind-rated roller doors

Delivery

From the Vietnamese port to Vieux Fort

Our CIF terms land the steel in Saint Lucia at the port the sailing serves, confirmed at booking; from Castries it runs south by road.

  1. Our plantPacked in erection order
  2. At seaAbout 45 days to Saint Lucia, typical sailing
  3. Port of entryCleared by your broker
  4. By roadTo the south coast
  5. Vieux FortUnloaded at your lot

From our plant

Cladding, intake, blasting and packing

Real World Steel photos from our plant and projects in Vietnam. None is shown as a Vieux Fort site.

1
1
1
1

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any Saint Lucia estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel buildings in the Vieux Fort Free Zone

Where is the Vieux Fort Free Zone?

In Vieux Fort on the south coast of Saint Lucia, the town of Hewanorra International Airport. It is run by Invest Saint Lucia.

How big is it?

12.7 acres with five factory shells, about 60% let, according to the ISL portfolio. The Hewanorra Free Zone and the Vieux Fort Industrial Estate are nearby.

Can you make warehouses and cold stores?

Yes. We design and fabricate clear-span stores, factory shells and cold store frames for the lot you hold.

Do you design for hurricanes?

Yes. Your engineer of record sets the wind and seismic basis; we design the frame, doors and cladding fixings to it.

Do you erect the buildings?

No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.

How does steel reach Vieux Fort?

By sea to Saint Lucia, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking. We supply FOB Vietnam or CIF to the Saint Lucian port the sailing serves.

Building in the Vieux Fort Free Zone?

Send the lot, the use and your engineer’s code basis. We design, fabricate and ship CIF Saint Lucia.