Three setups
Where the hoist rides
Why it pays
Lifts that run all day
- Trolley fits the beamChecked in design.
- Support steel checkedThe building carries the lift.
- Fast, repeatable liftsElectric, all day.
- One packageHoist, beam and steel.
Specification
Hoists at a glance
- Hoists
- Electric hoists made by World Steel
- Beams
- Monorail, jib and crane beams sized for the trolley
- Support steel
- Designed to AISC 360 and AISC Design Guide 7; welding to AWS D1.1
- Duty
- Duty class referenced from CMAA 70 or 74
- Power
- Provided by your electrician
- Installation
- Mounted, tested and commissioned by a qualified installer under OSHA and local rules
How it works
From lift data to a working hoist
- Lift dataCapacity, path, duty.
- Beam and supports designedWith the building.
- FabricatedHoist and steel.
- Shipped and installedBy a qualified installer.
Photo
PhotoQuestions
Hoist questions
Monorail, jib or crane?
A monorail follows one path, a jib serves one workstation, and a crane covers a whole bay. We help you pick based on how and where you lift.
Who installs the hoist?
A qualified installer mounts, tests and commissions it under OSHA and local rules. Your electrician provides power.
Can the hoist go on an existing beam?
Only after the beam and its supports are checked for the new loads. Send us the details.
More crane and industrial supports: Crane Runway Beams · Crane Supporting Columns · Equipment Platforms · Maintenance Walkways · Machinery Support Frames · Loading Platforms · Industrial Access Systems · Overhead Cranes
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Hoists
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides