Certificates & accreditations
IAS AC472 certificate of accreditation, valid to August 1, 2027
The certificate in force today: Part A and Part C, with Smith-Emery still conducting the plant inspections.
JPG · 172 KB · 1 page · English
Certificate no. 2797 CPR 827443 for World Steel Construction Joint Stock Company, Lot Q9-10-15-16, Street No 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa commune, Tay Ninh Province, Vietnam. Standard: EN 1090-1:2009+A1:2011, execution of steel structures and aluminium structures, up to and including Execution Class 3 (EXC3) as defined in EN 1090-2. Issued by BSI Group The Netherlands B.V., Notified Body 2797, under the EU Construction Products Regulation 305/2011 (system 2+). First issued July 25, 2025. The certificate has no fixed expiry date: it stays valid as long as the standard, the product, the assessment methods and the manufacturing conditions in the plant are not modified significantly, unless suspended or withdrawn.
Certificates & accreditations
Certificates & accreditations
The certificate in force today: Part A and Part C, with Smith-Emery still conducting the plant inspections.
JPG · 172 KB · 1 page · English
Certificates & accreditations
World Steel's quality management system, audited and found to conform to ISO 9001:2015. Certified since September 2023.
PDF · 327 KB · 1 page · English
Certificates & accreditations
World Steel's environmental management system, audited and found to conform to ISO 14001:2015. Certified since September 2023.
PDF · 337 KB · 1 page · English
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.