Where
Caymanas, St Catherine, west of Kingston.
Zone plan
The zone was announced in 2022; these are the plans reported then.
Caymanas, St Catherine, west of Kingston.
More than 650 acres of industrial and commercial space.
CSEZ South, a flagship industrial park of about 583 acres for port-linked tenants.
The Port Authority of Jamaica, mandated to start the project.
Government investment in water, broadband and other utilities.
50 years of tax-free benefits announced for investors.
Sources: Jamaica Observer (June 2022), Site Selection (May 2022). The zone was in planning when reported; check its status with the Port Authority.
Tenant buildings
A zone serving the Port of Kingston fills with logistics, manufacturing and services. These are the buildings each brings.
Large clear-span warehouses with docks and racking.
Warehouse buildingsFactories for nearshoring and light manufacturing.
Manufacturing plantsCold stores and packhouses for food exporters.
Cold storage buildingsMulti-storey frames for offices and services.
Multi-storey framingPhased supply
New zones fill in phases. We plan the supply so each building arrives when its lot is ready.
Send the lot and the first building; we fix spans and grids that later phases repeat.
Fabricated and shipped CIF Kingston in erection order.
Same details, so extensions bolt on without changes.
Our plant output covers several tenants at once.
Ground and quakes
The Kingston area has a history of strong earthquakes and low-lying ground. Your engineer sets the seismic basis and foundations; we design a frame that keeps loads low and connections to the seismic detailing they require.
From our plant
Real World Steel photos from our plant and projects in Vietnam. None is shown as a Caymanas site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Jamaica industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
At Caymanas in St Catherine, west of Kingston, according to public reports from 2022.
Reports in 2022 described more than 650 acres, with an industrial park of about 583 acres. The zone was then in planning; check its status with the Port Authority of Jamaica.
Distribution centres, assembly plants, cold stores and packhouses, and multi-storey offices.
Yes. We fix building grids that later phases repeat and ship each building when its lot is ready.
Yes. Your engineer of record sets the seismic basis; we design the frame and connections to it.
By sea to Kingston, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then by road west. We supply FOB Vietnam or CIF Kingston.
Send the lot and the first building. We design a grid later phases can repeat and ship CIF Kingston.