Cross-dock
60 m × 150 m (197 × 492 ft)
9,000 m² with docks on both long sides
Warehouse layouts
Illustrative layouts for a lot of about 2 ha. We set the real one to your lease plan, dock count and racking.
60 m × 150 m (197 × 492 ft)
9,000 m² with docks on both long sides
48 m × 120 m (157 × 394 ft)
5,760 m², a third kept as cold rooms
54 m × 108 m (177 × 354 ft)
5,830 m² with a mezzanine pick floor
Park profile
What a 2022 Site Selection report says about the park and the port beside it.
Kingston, close to the Kingston Freeport Terminal and Norman Manley International Airport.
An 18,000 m² warehouse.
The Port Authority of Jamaica, developing the park as an SEZ.
Kingston Freeport Terminal run by a CMA CGM company on a 30-year concession since 2015.
Source: Site Selection (May 2022), which gives the park’s size as both 80 acres and 40 ha. Check lots with the Port Authority.
Delivery
The park sits beside the port where our steel lands, so the last leg is short.
Cold chain
Food and pharma logistics need chilled and frozen space next to ambient halls. We design the frame for insulated panels, refrigeration plant on the roof and the floor loads of racking.
From our plant
Real World Steel photos from our plant and projects in Vietnam. None is shown as a Kingston site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Jamaica industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
In Kingston, close to the Kingston Freeport Terminal and Norman Manley International Airport, developed by the Port Authority of Jamaica, according to public reports.
A 2022 report gives both 80 acres and 40 ha, with a first-phase warehouse of 18,000 m². Check lots with the Port Authority.
Typically 5,500 to 9,000 m², such as a 60 m × 150 m (197 × 492 ft) cross-dock. We set the layout to your lease plan and dock count.
Yes. We design the frame for insulated panels, refrigeration plant on the roof and racking loads.
No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.
By sea to Kingston, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then a short run by road. We supply FOB Vietnam or CIF Kingston.
Send the lot, dock count and racking plan. We design the warehouse and ship it CIF Kingston.