Where
South-west of Montego Bay, St James, on the north coast.
Zone profile
What public reports say about the zone.
South-west of Montego Bay, St James, on the north coast.
Established in 1985.
About 95 acres (38 ha).
About 45,347 m² (488,110 sq ft) of factory and office space, with about 9,570 m² (103,000 sq ft) more added for IT.
Source: Wikipedia, Jamaican Free Zones, citing an older archived report. Check space with the zone’s managers.
Buildings
Montego Bay’s zone mixes business services with light industry. These are the buildings its tenants order.
Multi-storey
Two- to four-storey steel frames for contact centres and offices.
Multi-storey framingHeavy roofs
Shells and rooms with roofs for cooling plant and generators.
Data center shellsClear span
Halls and stores for light manufacturing and hotel supply.
Warehouse buildingsDelivery
Our CIF terms land the steel at Kingston. From there it crosses the island by road to Montego Bay, so bundles are sized for road trucks.
Hurricanes
The north coast takes the full force of passing hurricanes. Your engineer sets the wind basis; we design the frame, cladding fixings, openings and doors to it, and choose coatings for sea air.
From our plant
Real World Steel photos from our plant and projects in Vietnam. None is shown as a Montego Bay site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Jamaica industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
South-west of Montego Bay in St James, on Jamaica’s north coast, according to public reports.
Public reports describe 95 acres (38 ha) and about 45,347 m² of factory and office space, with more added for IT. Check space with the zone’s managers.
Multi-storey service centres and offices, data rooms and stores for light industry and hotel supply.
By sea to Kingston, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then by road across the island. We supply FOB Vietnam or CIF Kingston.
Yes. Your engineer of record sets the wind basis; we design the frame, cladding fixings and openings to it.
No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.
Send the lot, the use and your engineer’s code basis. We design, fabricate and ship CIF Kingston.