Where
Kingston, next to the Kingston Container Terminal on the harbour.
Free zone to SEZ
How Jamaica’s free zones became special economic zones, from public reports.
The Kingston Free Zone opens beside the container terminal.
The Special Economic Zone Authority takes over the free zone regime.
104 free zone companies receive SEZ designation.
Operating under the SEZ regime in 195 locations.
Sources: Wikipedia (Jamaican Free Zones), Jamaica Information Service (2018), Jamaica Observer (2024). The 2016 date is the year the SEZ Authority was set up.
Zone profile
What public reports say about the zone.
Kingston, next to the Kingston Container Terminal on the harbour.
About 180,000 m² (1.9 million sq ft).
About 72,835 m² of factory space, a figure the source marks as needing a citation.
Government-owned.
Source: Wikipedia, Jamaican Free Zones. Check space and leases with the zone’s managers.
Port of Kingston
On CIF Kingston, our steel arrives at the same harbour the zone faces. Your broker clears it and the trucks have a short run to the lot. Bundles are labelled by building and area so a crew can unload in erection order.
Buildings
What Kingston Free Zone tenants order, each linked to the World Steel package behind it.
Clear-span stores with dock doors for goods in transit.
Warehouse buildingsHalls for assembly, packing and light manufacturing.
Manufacturing plantsInsulated rooms for food in transit through the port.
Cold storage buildingsSteel mezzanines to add offices or storage inside a shell.
Steel mezzanine framesHurricanes and salt
Kingston lies in the hurricane belt and on a seismic coast. Your engineer sets the wind and seismic basis; we design the frame, cladding fixings and doors to it and pick coatings for harbour salt.
From our plant
Real World Steel photos from our plant and projects in Vietnam. None is shown as a Kingston site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Jamaica industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
In Kingston, next to the Kingston Container Terminal on the harbour, according to public reports.
It opened in 1976 as Jamaica’s first free zone, on a site of about 180,000 m², public reports say. Check space with the zone’s managers.
Bonded warehouses, light factories, cold stores and steel mezzanines inside existing shells.
Yes. Your engineer of record sets the wind basis; we design the frame, cladding fixings and doors to it.
No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.
By sea to Kingston, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then a short run by road. We supply FOB Vietnam or CIF Kingston.
Send the lot, the use and your engineer’s code basis. We design, fabricate and ship CIF Kingston.