Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Special building accessories · Platforms

Extra working space, without a full mezzanine

Sometimes you need a raised area for work, storage or service, but not a full mezzanine floor. A steel platform gives you that space where you need it, at the height you need it. We analyse the beams, columns, bracing and guard framing in SAP2000, detail them in Tekla Structures and fabricate them in our accredited plant in Vietnam, marked for bolted erection.

Isometric view of a raised steel platform with deck, beams, columns, bracing and guardrails Guard Deck Bracing
IllustrationAnalysed in SAP2000, detailed in Tekla Structures.

Build-up

A platform, layer by layer

GuardsGuard framing where people work.
DeckDecking or finishes by others, on our framing.
BeamsSized for your use and live loads.
Columns and bracingBolted to the slab and braced.

Why it pays

Space without the full floor

  • Space where you need itNo full mezzanine needed.
  • Modelled in 3DTekla Structures detailing.
  • Bolted erectionFast to assemble.
  • Accredited plantIAS AC472 since 2019.

How it works

From loads to bolted pieces

  1. Use and loadsWhat the platform carries.
  2. AnalysedIn SAP2000.
  3. DetailedIn Tekla Structures.
  4. Shipped markedFor bolted erection.

Specification

Platforms at a glance

Framing
Beams, columns and bracing
Analysis
SAP2000; detailing in Tekla Structures
Design
Designed to AISC 360 under the IBC
Guards
Guard framing; OSHA guarding rules where workers use the platform
Deck
Decking or finishes specified by others
Erection
Marked for bolted erection
Stiffened heavy plate girders resting on shop supportsPhoto
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Quality inspector taking dimensions on a finished steel memberPhoto
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.

Questions

Platform questions

Platform or mezzanine?

A platform is a local raised area. A mezzanine is a full intermediate floor, often with its own code requirements. We design both; see Steel Mezzanine Frames for full floors.

Who supplies the deck?

Decking or finishes are specified by others. We can also supply grating or checker plate.

How is it erected?

Your erector bolts it together from marked pieces.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Platforms

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of special building accessories, standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.