Machine shop
A crane-served bay with runway beams and columns designed for the crane, and floor room to strip pumps, compressors and turbines.
Crane runway beams →Large-project capacity
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
Daily work and the turnaround
Switch on the turnaround to see what the same maintenance area needs for a few busy weeks.
Day to day
A crane-served shop, a warehouse for spares and an office and locker block. The frame is sized for the cranes and the racks, with clear floor for forklifts and pull-out space for bundles and rotors.
During a turnaround
The same site with laydown under canopies, a contractor village and a second crane bay. Planning the frame for this from the start means the extra space can be added in steel without stopping the plant.
Inside the maintenance area
A crane-served bay with runway beams and columns designed for the crane, and floor room to strip pumps, compressors and turbines.
Crane runway beams →A cleaner room off the main shop, with jib cranes, benches and a test area kept apart from the heavy work.
Steel mezzanine frames →A clear-span store for spares, pipe and fittings, with racking and a mezzanine for small parts.
Long-span steel structures →A two-storey block for planners, permits, lockers and wash rooms, framed in the same steel package.
Multi-storey steel framing →Inside a petrochemical complex
We designed, fabricated and supplied about 2,000 t of steel structures covering more than 56,000 m² (about 600,000 sq ft) inside the Long Son petrochemical complex. We do not have a US plant reference yet.
Photo
Photo
Photo
Photo
Scope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
6 answers, grouped by topic.
Yes. Runway beams, brackets and columns are designed with the frame for the crane data. The overhead cranes can come from us with the runway, or from a crane maker you choose.
Yes. We can plan end walls and bays so more steel can be added later, and supply canopies and laydown shelters for the turnaround itself.
The design team picks the system for the plant atmosphere, often a multi-coat paint system or galvanizing. Coating products we use carry UL certification.
Yes. At the Long Son petrochemical complex in Vietnam we designed, fabricated and supplied about 2,000 t of steel structures covering more than 56,000 m². We do not have a US plant reference yet.
Yes. Pieces are marked, bundled and shipped in erection sequence, and you can follow each lot in PEB Studio.
The US contractor, our customer, and the plant owner. World Steel designs and fabricates the steel and does not work on site.
Keep reading
Price it or partner with us
Share the shop, stores, offices and the turnaround plan. We will price the maintenance area as one steel package.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833