Process structures

Process structures: level by level, piece by piece

A process structure is an open steel frame, several levels high, that holds vessels, exchangers, piping and the platforms people walk on to run them. Each level carries something different, and the owner spec sets how every piece is welded, tested, coated and recorded. Our plant fabricates 2,500 t of structural steel a month for US contractors who build these structures.

Large-project capacity

Process steel for a large plant, from one shop

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

Walk the structure

What the steel carries at each level

Pick a level, from the top deck down to grade, to see what the frame is designed to hold there.

TOP EQUIP PIPE GRADE

Air coolers, fans and relief piping sit on the top deck, so the frame is designed for their weight, vibration and the wind on a tall, open structure.

Mechanical equipment support steel →

Vessels and exchangers sit on heavy beams and support frames, with lifting lugs, davits and space to pull a tube bundle planned with the steel.

Machinery support frames →

Pipe runs cross the structure on beams and cantilevers spaced to the piping layout, with room left for later lines when the owner asks for it.

Pipe racks and process steel →

Columns land on base plates and anchor bolts set by the foundation design, with bracing kept clear of pumps, access ways and fire water.

Built-up steel columns →

The owner spec

Six lines every process job is checked against

Oil, gas and chemical owners write their own specifications. We work to the one in your contract and record what we did, piece by piece.

Material

Plates and sections to the ASTM grades in the spec, with mill certificates traced to each piece. EN 10204 3.1 certificates with impact tests are available on request.

Welding

Qualified procedures and welders to AWS D1.1, with weld maps when the spec asks for them.

Testing

Visual inspection on every weld and the NDT rate the spec sets, recorded per piece. Third-party or owner inspectors can join remotely.

Coating

The coating system in the spec, from shop primer to multi-coat systems, or galvanizing by an outside galvanizer in Vietnam.

Records

A data book per shipment with material, weld, NDT and coating records, tied to the piece marks on the drawings.

Marking

Piece marks stamped or tagged on every member and matched to the erection drawings, so pieces go up in the right place.

Oil and gas reference

Long Son petrochemical complex, about 2,000 t

In Ba Ria–Vung Tau, Vietnam (2022), we designed, fabricated and supplied about 2,000 t of steel structures covering more than 56,000 m² for the oil and gas sector. We do not have a US process structure reference yet.

See the project

From our plant in Vietnam

Heavy members are built up, welded, checked and coated in our own shop before they ship.

Welder fitting up heavy built-up H-beams on assembly stands in the World Steel plant Photo
Steel truss being fabricated under overhead cranes in the World Steel plant Photo
Painted steel frame parts with welded connection plates in the World Steel plant Photo
Steel members with drilled end plates laid out in the World Steel plant Photo

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Process structure frames, equipment beams, pipe supports, platforms, stairs and handrails designed to the contract documents
  • Material, welding, NDT and coating to the owner spec, with a data book per shipment
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Process design, piping, equipment and owner approvals
  • Foundations, anchor bolts and site work
  • Erection, fireproofing on site and tie-ins to the plant

Questions from US contractors

Process structure steel: questions and answers

6 answers, grouped by topic.

Levels and loads 3 answers

Who sets the loads on each level?

The process and piping designers give equipment weights, pipe loads and operating cases. Our design team turns them into the frame, and your Engineer of Record approves the result.

Can the structure be shipped in modules?

We ship members and assemblies sized for containers and breakbulk. Larger preassembled modules are planned with the US contractor and the shipping route for each job.

Do you supply platforms, stairs and handrails with the frame?

Yes. Platforms, stairs, ladders and handrails are detailed with the frame so they fit the first time on site.

Owner specs and records 3 answers

Can you work to our company specification?

Yes. Material, welding, testing, coating and records follow the owner spec and the inspection and test plan agreed for the job.

Can our inspector check the steel before it ships?

Yes. Owner and third-party inspectors can visit the plant or join remotely, and hold points are set in the inspection and test plan.

Do you have a refinery process structure reference?

Not yet. Our oil and gas reference is the Long Son petrochemical complex in Vietnam, where we designed, fabricated and supplied about 2,000 t of steel structures covering more than 56,000 m². We do not have a US process structure reference yet.

Keep reading

Related pages

Price it or partner with us

Send the structure drawings and the owner spec.

Share the general arrangement, the loads and the company specification. We will price the frame, platforms and records together.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.