Your matched steel package
Oil, Gas & Industrial Processing
Treat these as a first pass pulled from our reviewed engineering content. Your Engineer of Record confirms the structural design, and your local building department decides on code compliance and the permit.
Framing approaches to consider
- Heavy steel fabrication
- Welded built-up members
- Access platforms
- Protective coatings
Points your engineer will check
Weld procedures, NDT and coating inspection are fixed in an inspection and test plan before cutting starts.
From: Oil, Gas & Industrial Processing
Owner engineering standards frequently add requirements on top of the building code.
From: Oil, Gas & Industrial Processing
Module and member sizes are planned around shipping and crane limits.
From: Oil, Gas & Industrial Processing
Components to include
Coating and corrosion options
Systems in scope
Services that apply
Guides to read next
Comparable buildings
What happens next
- Share drawings, a sketch or simply the footprint and ZIP code.
- We agree the design loads with your Engineer of Record and draft a package scope.
- You get a written proposal listing what is in, what is out and the Incoterm.
Adjust your answers
Bidding a large US project?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.