Large-project capacity
Every store on the program, from one plant
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
Inside the shell
Five kinds of store, five demands on the steel
Open a store to see what its frame has to give. The crates above jump here too.
VEH-01 Vehicles and equipment
Wide door openings with framed headers, a clear span so vehicles turn without columns in the way, and wash or service bays where the program asks for them. Floor drains and slabs are by others.
Industrial overhead doors →SUP-02 Supplies and spares
Pallet racking on the slab and a steel mezzanine for small parts. The rack supplier gives the loads and any tie-backs, and the mezzanine is designed into the frame.
Steel mezzanine frames →REC-03 Records and archives
A dry, sealed envelope with insulated panels and few openings. Fire ratings and any vault rooms are set by the design team; we frame the walls and roof around them.
Insulated metal panels →HAZ-04 Hazardous materials
Usually a small building set apart from the main store, with louvers for ventilation and a frame that clears the spill containment. Separation distances and containment are by the design team.
Ventilation openings →BLK-05 Open-sided bulk storage
A roof on columns for materials that only need cover: aggregates, cable drums, pipe and seasonal gear. Wind uplift and the column bases govern.
Equipment shelter buildings →Before the frame is sized
Four things to settle on a federal or public store
Codes the contract names
Federal and public solicitations name the code editions and any agency criteria. We design to the editions in the contract, and your Engineer of Record confirms them.
Sourcing clauses
Some federal contracts restrict foreign steel. The US contractor, our customer, confirms the clauses with the contracting officer before we quote.
Submittal format
Drawings, calculations, mill certificates and inspection records are bundled in the format the solicitation asks for.
Future growth
An end wall framed for extension lets the store grow by bays later without a new building.
From our project files
JSB warehouse, Thailand: a customer who came back
JSB first built a 28 m wide warehouse with us, then came back for one 55 m wide and 127 m long. A store that size is the shell most storage programs need, with room for racking, vehicles and a mezzanine inside.
See the JSB project
Photo
Photo
Photo
Photo
Scope, in writing
What we supply and what stays with your team
World Steel, our plant in Vietnam
- Frame, door header, mezzanine and canopy steel designed to the contract documents
- Mill certificates with heat numbers traced to each member, for the submittal file
- Shop and erection drawings at no extra cost, ready for your Engineer of Record
- Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio
The US contractor, our customer
- Drawing approval, the PE seal and the permit with your Engineer of Record
- Sourcing clauses and submittals with the contracting officer
- Slabs, drains, spill containment and site security
- Erection, doors, racking and fit-out
Questions from US contractors
Government storage building steel: questions and answers
6 answers, grouped by topic.
Stores and layout 3 answers
Can one building hold vehicles, supplies and records?
Yes, with the stores separated by walls inside one shell. Hazardous materials usually go in a separate small building, as the design team decides.
Can the frame carry pallet racking or a mezzanine?
Yes. Racking normally stands on the slab; when it is tied to the frame or a mezzanine is added, the supplier gives the loads and we design for them.
Can the building be extended later?
Yes. An end wall framed for extension lets more bays be added later on the same column lines.
Federal and public work 3 answers
Can you supply steel for a federally funded project?
Some federal contracts restrict foreign steel. The US contractor, our customer, confirms the clauses with the contracting officer before we quote, and each quote names the Incoterm and the importer of record.
Which codes do you design storage buildings to?
To the editions and any agency criteria named in the contract, typically IBC 2024, ASCE 7-22 and AISC 360. Approval and the PE seal stay with your Engineer of Record.
What documents come with the steel?
Shop and erection drawings, design calculations, mill certificates with heat numbers and our inspection records, bundled for the submittal.
Keep reading
Related pages
Price it or partner with us
Send the storage program and the solicitation.
Share the stores you need, the door and racking list and the codes the contract names. We will price the frame, the mezzanines and the canopies.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833