Large-project capacity
The plant hall, its pump houses and pipe racks, from one plant
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
5,000 t
Sunpro Steel Factory
Can Tho City, Vietnam · 2024
2,500 t
CPV Food Processing Factory
Dong Nai Province, Vietnam · 2020
2,000 t
Long Son petrochemical
Ba Ria–Vung Tau, Vietnam · 2022
2,000 t
M&D warehouse, Thailand
Thailand · 2024
1,500 t
Tongwei feed factory, phase 1
Dong Thap Province, Vietnam · 2018
1,000 t
New Era cold storage, phase 1
Tay Ninh Province, Vietnam
Equipment schedule
Six kinds of plant, and what each asks of the steel
The equipment suppliers and engineers give the weights and openings. We frame the building around them.
| Equipment | What the steel gives | Related part |
|---|---|---|
| Generators | Wide doors or removable wall panels for setting units, louvers for air, and a frame that clears the exhaust and the acoustic enclosure. | Louvers → |
| Switchgear and transformers | A clean, dry room with cable tray supports and an access floor or trench detailed with the electrical engineer. | Cable tray supports → |
| Chillers and cooling towers | Heavy units on the slab or on roof steel, with dunnage and platforms for the towers and access for service. | Mechanical equipment support steel → |
| Boilers | A hall with flue openings framed in the roof, and a hoist beam over the burners and tubes. | Hoists → |
| Pumps and water treatment | Pump houses and treatment rooms with a crane or monorail over the pumps and a coating chosen for the damp. | Epoxy coatings → |
| Pipe racks and walkways | Racks that carry the piping and cables between buildings, with walkways and stairs for maintenance. | Maintenance walkways → |
Walls and roof
Four details that make a plant building easy to run
Replace, not only install
Equipment wears out long before the building does. Removable wall panels or wide doors on the right side save cutting the building open later.
Louvers and airflow
Generators and boilers need air in and out. Louver openings are framed with girts and trimmers at the sizes the mechanical engineer gives.
Hoist and crane beams
A monorail or bridge crane over the heavy items is designed with the frame, so its loads are in the columns from the start.
Security and resilience
Where the program asks for hardened walls or higher wind or seismic categories, the design team sets the criteria and we design the steel to them.
From our plant
Heavy members, thick base plates
A plant building carries more than its roof: hoists, platforms and equipment on steel. Stiffened members and thick base plates are cut on our laser machines, which handle plate up to 100 mm thick, then welded and checked in the shop.
Equipment platforms
Photo
Photo
Photo
Photo
Scope, in writing
What we supply and what stays with your team
World Steel, our plant in Vietnam
- Hall frame, hoist and crane beams, platforms, pipe racks and equipment support steel designed to the contract documents
- Framed openings for louvers, flues, doors and removable panels at the sizes the engineers give
- Shop and erection drawings at no extra cost, ready for your Engineer of Record
- Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio
The US contractor, our customer
- Drawing approval, the PE seal and the permit with your Engineer of Record
- Generators, chillers, boilers, pumps and their suppliers
- Electrical, fuel, piping and controls
- Foundations, equipment pads, erection and fit-out
Questions from US contractors
Utility building steel: questions and answers
6 answers, grouped by topic.
Equipment and loads 3 answers
Can the frame carry a crane or hoist over the equipment?
Yes. A monorail or bridge crane is designed with the frame from the start, using the hoist capacity and the maker’s wheel loads.
Who gives the equipment loads and openings?
The equipment suppliers and the mechanical and electrical engineers. We frame the openings, platforms and supports to the sizes and loads they give.
Can chillers or cooling towers sit on the roof?
Yes, on dunnage steel framed into the roof, with platforms and ladders for service. The units’ weights and vibration data come from the supplier.
Programs and codes 3 answers
Can one order cover the plant, pump houses and pipe racks?
Yes. The plant fabricates 2,500 t of structural steel a month, so the buildings and racks of a utility program can ship together, marked by area.
Can you supply steel for a federally funded utility plant?
Some federal contracts restrict foreign steel. The US contractor, our customer, confirms the clauses with the contracting officer before we quote.
Which codes do you design utility buildings to?
To the editions and any agency criteria in the contract, typically IBC 2024, ASCE 7-22 and AISC 360. Approval and the PE seal stay with your Engineer of Record.
Keep reading
Related pages
Price it or partner with us
Send the equipment list and the plant layout.
Share the equipment schedule with weights, the hoist capacity and the openings. We will price the hall, the platforms and the pipe racks.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024