Wide, regular bays
Column lines at 9 to 12 m (30 to 40 ft) leave office floors open. The bay size is agreed with the architect and the Engineer of Record before the floor is designed.
Multi-storey steel framing →Large-project capacity
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
| Project | Sector | Where | Structural steel |
|---|---|---|---|
| Sunpro Steel Factory | Steel industry | Can Tho City, Vietnam · 2024 | 5,000 t |
| CPV Food Processing Factory | Food processing | Dong Nai Province, Vietnam · 2020 | 2,500 t |
| Long Son petrochemical | Oil and gas | Ba Ria–Vung Tau, Vietnam · 2022 | 2,000 t |
| M&D warehouse, Thailand | Warehouse and industrial | Thailand · 2024 | 2,000 t |
| Tongwei feed factory, phase 1 | Animal feed | Dong Thap Province, Vietnam · 2018 | 1,500 t |
| New Era cold storage, phase 1 | Cold storage, phase 1 tonnage | Tay Ninh Province, Vietnam | 1,000 t |
Typical floor
A regular grid, braced cores and composite floors: walls can move for the next reorganization while the steel stays where it is.
Column lines at 9 to 12 m (30 to 40 ft) leave office floors open. The bay size is agreed with the architect and the Engineer of Record before the floor is designed.
Multi-storey steel framing →Braced frames around the cores carry wind and seismic loads, so the office floor between them stays free of bracing.
Roof bracing →Metal deck with a concrete topping on steel beams with shear studs, a fast floor that is ready for the next trade.
Composite floor support steel →The lobby is often a taller bay with a canopy at the door. Any vehicle barriers and standoff are set by the design team.
Entrance covers →From the design team
The contract names the code editions and any agency criteria. We design to what it names, and your Engineer of Record confirms the basis.
Standoff distances, blast loads and window protection come from the design team and the agency. We frame the building to the loads they set.
Long-span office and conference floors are checked for walking vibration with AISC Design Guide 11 methods.
Some federal contracts restrict foreign steel. The US contractor, our customer, confirms the clauses with the contracting officer before we quote.
From our own plant
The office in front of our fabrication halls in Vietnam stands on a multi-storey steel frame from our own shop: columns and beams lifted floor by floor, then clad in glass.
Photo
Photo
Photo
Scope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
6 answers, grouped by topic.
As tall as the project needs. Most administrative buildings are low or mid-rise, and the lateral system, braced cores or moment frames, is set with the design team before the members are sized.
Column lines of 9 to 12 m (30 to 40 ft) are common. The architect and your Engineer of Record agree the grid before the floor is designed.
We supply the frame and the floor support steel; deck and studs can be included when the contract asks for them. Concrete is by others.
The design team and the agency. We design and fabricate the frame to the loads and details they give, and your Engineer of Record approves it.
Some federal contracts restrict foreign steel. The US contractor, our customer, confirms the clauses with the contracting officer before we quote.
To the editions and agency criteria named in the contract, typically IBC 2024, ASCE 7-22, AISC 360 and, in high seismic areas, AISC 341.
Keep reading
Price it or partner with us
Share the architectural plans, the storey heights and any security or seismic criteria. We will price the frame, the floors and the canopy.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833