Where
Caracol, in the Nord-Est department of northern Haiti.
Since 2012
How the park grew, from public reports.
Financing from the Inter-American Development Bank starts the project.
SONAPI opens the park on 22 October 2012.
The first tenants are at work.
Eight industrial buildings of 113,000 m².
Sources: HaitiLibre (11 September 2015), Inter-American Development Bank.
Park profile
What public reports say about the park.
Caracol, in the Nord-Est department of northern Haiti.
252 hectares, with 75,750 m² of buildings planned for new companies.
A 10 MW plant, expandable to 35 MW, that also supplies nearby homes.
Textile and apparel makers for export.
Source: HaitiLibre (2015). Check lots and leases with SONAPI.
Hall sizes
Illustrative sizes. We set the real building to SONAPI’s lot plan, your production lines and your engineer’s basis.
60 m × 150 m (197 × 492 ft)
9,000 m² clear span for sewing lines
36 m × 90 m (118 × 295 ft)
3,240 m² with docks at one end
18 m × 48 m (59 × 157 ft)
860 m² on two floors
Buildings
Each building type links to the World Steel package or product behind it.
Production
Wide clear spans with daylight roofs and fans.
Manufacturing plantsInbound
Stores for rolls arriving through the port.
Warehouse buildingsEnergy
Roof steel sized to carry panels.
Solar canopiesPeople
Frames for canteens, clinics and offices.
Multi-storey steel framingEarthquakes and storms
Northern Haiti sits on an active fault zone and in the hurricane belt. Your engineer sets the seismic and wind basis; we design light steel frames, ductile connections, bracing and cladding fixings to it.
Delivery
Our CIF terms land the steel at Cap-Haïtien, the closest port to the park. From there it runs east by road.
From our plant
Real World Steel photos from our plant and projects in Vietnam. None is shown as a Caracol site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Haiti industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
In Caracol, in the Nord-Est department of northern Haiti. SONAPI, the national industrial park company, runs it.
Public reports in 2015 gave 252 hectares, eight industrial buildings of 113,000 m² and 75,750 m² planned for new companies. Check lots with SONAPI.
Mainly textiles and apparel for export.
Yes. Your engineer of record sets the seismic and wind basis; we design the frame, connections and bracing to it.
No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.
By sea to Haiti, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, landing at Cap-Haïtien and then east by road. We supply FOB Vietnam or CIF Cap-Haïtien.
Send the lot, the use and your engineer’s code basis. We design, fabricate and ship CIF Cap-Haïtien.