Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Haiti industrial estates · CODEVI free zone

Steel buildings for the CODEVI free zone at Ouanaminthe

CODEVI is a private free zone at Ouanaminthe, on Haiti’s border with the Dominican Republic, run by the Dominican apparel group Grupo M. Public reports in 2014 counted more than 7,000 Haitian employees after eleven years of work, making jeans, uniforms and knits for export, with a supplier micro-park added beside them. Tenants need sewing halls and stores. We design them to your engineer’s code basis, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them FOB Vietnam or CIF Cap-Haïtien.

CODEVI, from public reports

7,000+
Haitian employees (2014)
≈2003
start, eleven years by 2014
Apparel
jeans, uniforms and knits

2,500 t a month of structural steel from our own plant, FOB Vietnam or CIF Cap-Haïtien.

Zone profile

The CODEVI free zone at a glance

What 2013 and 2014 press reports say about the zone.

HaitiLibre, 2014

Where

Ouanaminthe, Nord-Est, on the border with the Dominican Republic.

HaitiLibre, 2014

Operator

Compagnie de Développement Industriel (CODEVI), part of the Dominican Grupo M.

HaitiLibre, 2014

People

More than 7,000 Haitian employees after eleven years of work.

HaitiLibre, 2014

Products

Jeans, uniforms and knits for export.

Sources: HaitiLibre (25 July 2014, 24 December 2013). Check space and leases with CODEVI.

Delivery

From the Vietnamese port to the border zone

Our CIF terms land the steel at Cap-Haïtien. From there it runs east by road to Ouanaminthe. Your forwarder can also plan a route through the Dominican side; we confirm the port at booking.

  1. Our plantPacked in erection order
  2. At seaAbout 45 days to Haiti, typical sailing
  3. Cap-HaïtienCleared by your broker
  4. East by roadAlong the north to the border
  5. OuanamintheUnloaded at the lot

Buildings

Buildings for an apparel free zone

What CODEVI tenants order, each linked to the World Steel package or product behind it.

Supplier units

Small steel units for local suppliers and services.

Portal frames

Supplier park

Small units beside the big halls

In 2013 CODEVI laid the first stone of a micro-park for local businesses that serve workers and the factories. Small portal-frame units go up quickly and can grow bay by bay; we design them as a kit your crew can repeat.

  • Repeatable small units
  • Bays that extend as a business grows
  • Seismic basis set by your engineer
  • Kits packed unit by unit

From our plant

Frames, fit-up, base plates and loading

Real World Steel photos from our plant and projects in Vietnam. None is shown as a CODEVI site.

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any Haiti estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel buildings at the CODEVI free zone

Where is the CODEVI free zone?

At Ouanaminthe in Haiti’s Nord-Est department, on the border with the Dominican Republic.

Who runs it?

The Compagnie de Développement Industriel (CODEVI), part of the Dominican apparel group Grupo M, according to public reports.

How many people work there?

Public reports in 2014 counted more than 7,000 Haitian employees.

What buildings do you supply?

Sewing halls, wash and finishing plants, stores and small supplier units.

Do you erect the buildings?

No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.

How does steel reach Ouanaminthe?

By sea to Haiti, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, landing at Cap-Haïtien and then east by road. We supply FOB Vietnam or CIF Cap-Haïtien.

Building at the CODEVI free zone?

Send the lot, the use and your engineer’s code basis. We design, fabricate and ship CIF Cap-Haïtien.