Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Curaçao industrial estates · Nieuwe Haven

Steel units and workshops for Nieuwe Haven and the Dokweg park

With the Brievengat park full, Curaçao’s government agreed in 2023 to turn a third of the Nieuwe Haven economic zone on Willemstad harbour into an industrial and commercial area for more than 60 companies. The first part, the 25,000 m² Parke Industrial Dokweg, was fully let within a year to nearly 35 businesses. We design the next units, workshops and stores to your engineer’s code basis, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them CIF Willemstad.

Dokweg, from public reports

25,000 m²
Dokweg park, fully let (2024)
≈35
businesses at Dokweg
60+
companies planned for Nieuwe Haven (2023)

2,500 t a month of structural steel from our own plant, FOB Vietnam or CIF Willemstad.

How it opened

From a full park to a new industrial area

What public reports say about Nieuwe Haven.

  1. 2018

    First request

    Curinde asks the government for more industrial land.

  2. 2022

    Brievengat full

    Plans to modernise the zones and open Nieuwe Haven to industry.

  3. 2023

    One third

    Ministers agree to turn a third of Nieuwe Haven into an industrial area.

  4. 2024

    Dokweg full

    25,000 m², nearly 35 businesses and a waiting list.

Sources: Curaçao Chronicle (29 August 2022, 28 April 2023, 27 November 2024).

Unit sizes

Buildings sized for a Nieuwe Haven lot

Illustrative sizes. We set the real building to your lot, your tenants and your engineer’s basis.

Six-unit block

18 m × 60 m (59 × 197 ft)

6 units of 180 m² each

Trade workshop

20 m × 36 m (66 × 118 ft)

720 m² with a roller door

Building-materials store

24 m × 40 m (79 × 131 ft)

960 m² with racking

Buildings

What Dokweg-type tenants build

Air-conditioning, woodwork and building-materials firms fill Dokweg today; each type links to the World Steel package behind it.

Wind and salt

Built for the trade winds on the harbour

Curaçao is dry, windy and salty, with rare but heavy flash floods. Your engineer sets the wind basis; we design the frame, doors and cladding fixings to it and pick coatings for harbour salt.

  • Frames and cladding to your wind basis
  • Coatings for salt air
  • Slab levels for flash floods
  • Roller doors rated for wind

Delivery

From the Vietnamese port to Nieuwe Haven

Our CIF terms land the steel at Willemstad. Nieuwe Haven is on the same harbour, so the run by road is short.

  1. Our plantPacked in erection order
  2. At seaAbout 45 days to Willemstad, typical sailing
  3. WillemstadCleared by your broker
  4. Harbour roadThrough the Dokweg entrance
  5. Your lotUnloaded by building and area

From our plant

Frames, fit-up, blasting and packing

Real World Steel photos from our plant and projects in Vietnam. None is shown as a Curaçao site.

1
1
1
1

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any Curaçao estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel buildings at Nieuwe Haven and Dokweg

What is Parke Industrial Dokweg?

A 25,000 m² industrial park in the Nieuwe Haven zone on Willemstad harbour, fully let to nearly 35 businesses by late 2024, according to the Curaçao Chronicle.

What is changing at Nieuwe Haven?

In 2023 the government agreed to turn a third of the Nieuwe Haven economic zone into an industrial and commercial area for more than 60 companies, with its own entrance via Dokweg.

Can you make multi-unit buildings?

Yes. We design and fabricate one steel frame split into units, each with its own door, plus workshops and stores.

Do you design for wind and salt air?

Yes. Your engineer of record sets the wind basis; we design the frame and doors to it and pick coatings for salt air.

Do you erect the buildings?

No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.

How does steel reach Nieuwe Haven?

By sea to Willemstad, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking. We supply FOB Vietnam or CIF Willemstad.

Building at Nieuwe Haven?

Send the lot, the use and your engineer’s code basis. We design, fabricate and ship CIF Willemstad.