Designed for your traffic
Tell us what rolls on it
Why it pays
Every pallet moved once
Less handling
Goods roll, not lift.
Sized for your fleet
Real wheel loads.
Lines up with doors
Heights set in design.
Safer edges
Guardrails and stairs.
Specification
Loading platforms at a glance
- Framing
- Beams, columns and bracing, designed to AISC 360
- Deck support
- For steel plate, grating or a concrete topping by others
- Loads
- Sized for the pallet jacks, carts or forklifts you name
- Access
- Stairs and guardrails
- Coordination
- With doors, dock levelers and the main frame
- Welding
- AWS D1.1
Photo
PhotoHow it works
Heights and loads first
- Traffic and heightsEquipment and door levels.
- Platform detailedWith doors and frame.
- FabricatedFraming and deck supports.
- Shipped markedFor your erector.
Questions
Loading platform questions
Can forklifts drive on it?
Yes, if you tell us which ones. We design for their wheel loads and braking forces.
Who finishes the deck?
We supply steel deck plate or grating, or framing for a concrete topping that your contractor places.
Does it include a dock leveler?
No. We coordinate the platform with the leveler you choose, which is supplied by others.
More crane and industrial supports: Crane Runway Beams · Crane Supporting Columns · Equipment Platforms · Maintenance Walkways · Machinery Support Frames · Industrial Access Systems · Overhead Cranes · Hoists
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Loading Platforms
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides