Size
786 acres of industrial land in the Freeport free trade zone.
Park profile
What public reports say about the park.
786 acres of industrial land in the Freeport free trade zone.
Next to Grand Bahama International Airport and its 11,000 ft runway.
Between the airport and the Freeport Container Port.
A 100,000 sq ft warehouse on the first 20 acres.
Sources: Bahamas Investment Authority Freeport guide, The Bahamas Investor (2007), GBPA profile. Check lots and leases with the park’s managers.
Warehouse sizes
Illustrative sizes. We set the real building to your lot, your racking and your engineer’s basis.
60 m × 150 m (197 × 492 ft)
9,000 m² (≈97,000 sq ft) with docks
36 m × 90 m (118 × 295 ft)
3,240 m² with a mezzanine
30 m × 60 m (98 × 197 ft)
1,800 m² insulated rooms
Buildings
Each building type links to the World Steel product or package behind it.
Clear spans with docks and racking loads.
Warehouse buildingsSheds and canopies for cargo flown in and out.
Long-span steel structuresBright halls for light manufacturing and assembly.
Manufacturing plantsSteel mezzanines for offices and pick floors.
Steel mezzanine framesBig roofs, big storms
A wide warehouse roof has to hold down in hurricane winds. Your engineer sets the wind basis; we design the frames, purlins, roof bracing and dock doors to it, with coatings for island air.
Delivery
Our CIF terms land the steel at Freeport, then a short truck run takes it to the park between the port and the airport.
From our plant
Real World Steel photos from our plant and projects in Vietnam. None is shown as a Freeport site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
The Bahamas industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
In Freeport, Grand Bahama, between Grand Bahama International Airport and the Freeport Container Port, inside the free trade zone.
About 786 acres, planned for large warehousing, distribution, light manufacturing and assembly, according to the Bahamas Investment Authority.
Yes. We design and fabricate clear-span warehouses with docks, racking loads and mezzanines, and our plant makes 2,500 t of steel a month.
Yes. Your engineer of record sets the wind basis; we design the frame, roof and doors to it.
No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.
By sea to Freeport, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then a short run by road. We supply FOB Vietnam or CIF Freeport.
Send the lot, the use and your engineer’s code basis. We design, fabricate and ship CIF Freeport.