Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Bahamas industrial estates · Freeport Harbour

Steel buildings for Freeport Harbour and the Container Port

Freeport Harbour is the deep-water heart of the Freeport free trade zone, and its container port, opened in 1997, has a 1,037 m quay with a 16.1 m draft and handles about 1.1 million TEU a year. Harbour lots host warehouses, marine workshops and oil storage firms. We design their buildings to your engineer’s code basis, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them CIF Freeport.

Freeport Harbour, from public reports

1997
container port opened
16.1 m
draft at the quay
≈1.1 M TEU
handled a year, public reports

2,500 t a month of structural steel from our own plant, FOB Vietnam or CIF Freeport.

Container port

One of the deepest harbours in the region

On CIF Freeport, our steel lands in the same harbour the lots face. Your broker clears it and the trucks have a short run to the lot. Bundles are labelled by building and area so the crew can unload in erection order.

Quay1,037 mthree berths, public reports
Draft16.1 mships up to about 16,100 TEU
Throughput≈1.1 M TEUa year, public reports
Sea time≈45 daysVietnamese port to Freeport, typical sailing, confirmed at booking

Harbour story

From a harbour mandate to a transshipment port

How the harbour grew, from public reports.

  1. 1955

    Hawksbill Creek

    The agreement sets up the free trade zone and asks for a deep-water harbour and industry.

  2. 1960s

    First industry

    Oil storage, cement and pharmaceutical makers settle in the port area.

  3. 1997

    Container port

    The Freeport Container Port opens on 16 July.

  4. 2019

    Dorian

    The hurricane stalls over Grand Bahama with a large storm surge.

Sources: GBPA profile, Bahamas Investment Authority, Wikipedia (Freeport Container Port; Freeport, Bahamas).

Buildings

Harbour buildings for Freeport tenants

What harbour-side tenants order, each linked to the World Steel package behind it.

Transshipment stores

Clear-span warehouses with docks for boxes moving through the port.

Warehouse buildings

Marine workshops

Heavy halls with crane runways for harbour and ship work.

Crane runway beams

Terminal buildings

Pipe racks, shelters and stores for oil storage sites.

Oil and gas steel

Storms and salt

Harbour buildings that ride out a surge

Grand Bahama sits low and in the hurricane belt; in 2019 Dorian brought a surge of 12 to 18 ft above normal. Your engineer sets the wind and flood basis; we design the frame, doors and cladding fixings to it and pick coatings for harbour salt.

  • Frames and cladding to your wind basis
  • Slab and door levels for surge
  • Zinc-rich primer and epoxy coats
  • Wind-rated dock doors

Delivery

From the Vietnamese port to Freeport Harbour

Our CIF terms land the steel at Freeport, a short truck run from the harbour lots.

  1. Our plantPacked in erection order
  2. At seaAbout 45 days to Freeport, typical sailing
  3. FreeportCleared by your broker
  4. Harbour roadA short run inside the port area
  5. Your lotUnloaded by building and area

From our plant

Crane columns, girders, coating and packing

Real World Steel photos from our plant and projects in Vietnam. None is shown as a Freeport site.

1
1
1
1

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any The Bahamas estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel buildings at Freeport Harbour

What is the Freeport Container Port?

A Hutchison-run container port in Freeport Harbour, opened in 1997, with a 1,037 m quay, a 16.1 m draft and about 1.1 million TEU a year, according to public reports.

Who controls land and permits in the harbour area?

The Grand Bahama Port Authority regulates zoning, building permits and occupancy in the Freeport port area. We supply the steel building for the lot you hold.

Can you make harbour workshops with cranes?

Yes. We design and fabricate halls with crane runway beams, and we supply overhead cranes with the building on request.

Do you design for hurricanes and surge?

Yes. Your engineer of record sets the wind and flood basis; we design the frame, doors and cladding fixings to it.

Do you erect the buildings?

No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.

How does steel reach Freeport Harbour?

By sea to Freeport, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking. We supply FOB Vietnam or CIF Freeport.

Building at Freeport Harbour?

Send the lot, the use and your engineer’s code basis. We design, fabricate and ship CIF Freeport.