Four joints
Every place water tries to get in
Why it pays
The cheapest insurance on the building
Watertight joints
Laps shed water outward.
Drawn, not improvised
Every joint detailed.
Color-matched
Clean lines on the building.
Marked by location
Easy to install.
| Material | Formed coated steel, color-matched where available |
|---|---|
| Detailing | Every joint drawn with laps in the direction of water flow |
| Sealants | Sealants and closures scheduled with the flashings |
| Lengths | Cut to length and marked by location |
| Fixing | Screws matched to the panel fasteners |
| Supply | With the roof and wall panels |
- Joints detailedOn the shop drawings.
- Flashings formedCut and marked.
- Shipped with panelsWith sealants and closures.
Where they go
Flashed buildings across the US
- Roof flashingsRidge, rake and eave trims.
- Wall flashingsOpenings and corners.
- Coastal sitesWind-driven rain.
Photo
PhotoQuestions
Flashing questions
How is this different from roof and wall flashings?
This page covers flashings as a whole system across every joint. Our roof flashing and wall flashing pages go deeper into each area.
Do flashings come in custom colors?
Where available, they are formed from the same coated steel range as the panels, in matching colors.
Who installs flashings?
Your US contractor, from the details on our drawings.
More drainage and weather protection: Gutters · Downspouts · Ridge Closures · Eave Trims · Rainwater Accessories · Canopies · Entrance Covers · Loading Dock Canopies
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Flashings
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides