Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Shop crew in safety gear among rows of painted steel members

Members coated and staged inside a World Steel fabrication hall, Vietnam.

Industry intelligence engine

Steel recommendations for your project

Matched to the industry, building type, US region and priorities you chose. Each item explains why it made the list.

Your matched steel package

Marine, Ports & Coastal Infrastructure

Treat these as a first pass pulled from our reviewed engineering content. Your Engineer of Record confirms the structural design, and your local building department decides on code compliance and the permit.

Framing approaches to consider

  • Hot-dip galvanizing
  • Duplex galvanize-and-paint systems
  • High-performance coating systems
  • Details that shed water

Points your engineer will check

  • The corrosivity category (ISO 12944) is set from the site: distance to salt water, de-icing salt, humidity and what happens inside the building.

    From: Marine, Ports & Coastal Infrastructure

  • Connections are detailed without pockets that hold water, and dissimilar metals are separated.

    From: Marine, Ports & Coastal Infrastructure

  • Fasteners, trims and flashings are specified to the same durability as the frame they attach to.

    From: Marine, Ports & Coastal Infrastructure

Components to include

Coating and corrosion options

Systems in scope

Services that apply

Guides to read next

Comparable buildings

What happens next

  1. Share drawings, a sketch or simply the footprint and ZIP code.
  2. We agree the design loads with your Engineer of Record and draft a package scope.
  3. You get a written proposal listing what is in, what is out and the Incoterm.
Adjust your answers
Select your industry *
Your priorities

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.