Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Corrosion protection · Connection detailing

Most rust starts where water is trapped

Coatings fail first where water collects: inside channels facing up, in gaps between plates, around bolts, where two metals touch. Good detailing stops water from sitting there in the first place. It costs almost nothing on the drawing board and saves years of trouble on site. It is a design service, built into our shop drawings.

Two channel sections facing up: the left one holds a pool of water, the right one drains through a hole Water trap Drain hole
IllustrationA design service built into our shop drawings.

What we draw in

Six details that keep steel dry

  • Drain holesLet water out of pockets and stiffener corners.
  • Sealed or open gapsClose a joint fully or leave it open enough to dry, never half.
  • Section orientationChannels and angles turned so they do not hold water.
  • Metal isolationWashers or sleeves where stainless, aluminum and steel meet.
  • Rounded edgesCoatings cover rounded edges better than sharp ones.
  • Galvanizing holesVent and drain holes so zinc reaches inside.

Why it pays

Cheap on paper, priceless on site

  • Water runs off

    No pockets for it to sit in.

  • Coatings last longer

    Fewer weak spots.

  • Solved on paper

    Almost no cost to add.

  • In the shop drawings

    Not left to the site.

  1. Exposure reviewedWhere water and salt reach.
  2. Details drawnHoles, gaps, orientation.
  3. Built into fabricationHoles drilled in the shop.

Scope

Connection detailing at a glance

Type
Design service built into the shop drawings
Covers
Drainage, gaps, orientation, edges and metal isolation
Galvanizing
Vent and drain holes per ASTM A123 practice
Exposure
More detailing effort for ISO 12944 C4 and C5 sites
Cost
Included in our detailing; shop drawings at no extra cost
Approval
Drawings reviewed by the US contractor and their Engineer of Record
Quality inspector taking dimensions on a finished steel memberPhoto
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Fitter comparing a built-up beam with its shop drawingPhoto
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.

Questions

Detailing questions

Is this an extra charge?

No. Detailing is part of our shop drawing work, which we provide for all projects at no extra cost.

Does good detailing replace coatings?

No. It helps coatings work. The coating system is still chosen for the exposure.

Can existing details be reviewed?

Yes. If your designer has typical details, our detailers can review them for water traps before fabrication.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Protective Connection Detailing

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of corrosion protection, standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.