Water and wastewater plants

Water and wastewater plants: steel along the treatment train

A treatment plant is a line of stages, and nearly every stage has a building, a cover or a walkway beside the water. The air is wet and, on the wastewater side, carries hydrogen sulfide, so the coating matters as much as the frame. Our plant fabricates 2,500 t of structural steel a month, so a plant’s buildings and access steel can run as one order.

White-coated steel members for the Greenfeed factory in Cambodia laid out in the World Steel plant

Along the train

Six stages, and the steel at each

Headworks

A building over the screens and grit removal, with covers on the channels for odor control and a hoist beam for lifting screens.

Hoists →

Aeration and blowers

A blower building with acoustic walls and large louvers, and walkways along the basins for access to diffusers and valves.

Maintenance walkways →

Clarifiers

Access stairs and platforms at the tanks. The rotating bridge and mechanism come from the clarifier maker.

Stairs →

Chemical building

Separate rooms for each chemical, with containment by others and a coating chosen for the fumes.

Epoxy coatings →

Sludge and dewatering

A tall building for presses or centrifuges, with a truck bay below for loading cake.

Equipment platforms →

Wet and corrosive air

Why the coating matters as much as the frame

Wet air all year

Condensation and splash keep steel damp. Details avoid pockets that hold water, and the coating system is chosen for immersion or splash where it applies.

Hydrogen sulfide

Headworks and sludge buildings carry H2S, which attacks steel and ordinary paint. The design team sets the coating system, often galvanizing with an epoxy topcoat, and the ventilation.

Inspect and maintain

Members are marked and the coating recorded so the owner can inspect and repair them over the plant’s life.

From our plant

Coated members and frames from our shop

We have no treatment plant reference yet. These are members coated and checked in our plant and frames erected on site, the work a plant’s buildings and walkways need.

Duplex coating systems
Rows of white-coated steel members for the Greenfeed factory in the World Steel plant Photo
Grey-coated beams with red end plates in the World Steel plant Photo
Orange-primed steel members laid out for inspection in the World Steel plant Photo
Steel frames of a warehouse being erected on a green site in the Philippines Photo

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Process building frames, channel covers support steel, walkways, stairs and platforms designed to the contract documents
  • Coating systems for wet and H2S exposure, from galvanizing by an outside galvanizer in Vietnam to epoxy systems
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Process design, equipment, clarifier mechanisms and odor control
  • Basins, tanks, foundations and site piping
  • Erection, coating touch-up, envelope and fit-out

Questions from US contractors

Water and wastewater plant steel: questions and answers

6 answers, grouped by topic.

Treatment plant steel 3 answers

Which buildings in a treatment plant can be steel framed?

Headworks, blower, filter, chemical and sludge buildings, as well as the operations building. Basins and tanks are concrete or tank-maker steel by others.

Do you supply walkways and stairs at the basins?

Yes. Walkways, platforms and stairs along basins and at tanks are designed and fabricated with the buildings, galvanized where the specification asks for it.

Do you supply clarifier bridges?

No. Clarifier bridges and mechanisms come from their makers. We supply the access stairs and platforms around them.

Coatings and programs 3 answers

How is steel protected against H2S?

With the coating system the design team sets for the exposure, often hot-dip galvanizing with an epoxy topcoat, and with details that keep water and gas from collecting on the steel.

Can one order cover all the buildings of a plant upgrade?

Yes. The plant fabricates 2,500 t of structural steel a month, so the buildings and access steel of an upgrade can ship together, marked by stage.

Do you have treatment plant references?

Not yet. Our references are coated members and buildings fabricated in our plant; the process design stays with the plant’s engineers.

Keep reading

Related pages

Price it or partner with us

Send the plant layout and the building list.

Share the stages, the buildings and walkways you need, and the coating specification. We will price the steel stage by stage.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.