Site plan
What on a solar and battery site is structural steel
Point at an item in the legend to find it on the plan. Red tags are our steel; grey ones come from other makers.
-
O&M building and store
OUR STEELOffices, a workshop and a store for spare modules and inverters, in one clear-span building by the gate.
Workshop buildings with office → -
Inverter and equipment canopies
OUR STEELShade and rain covers over inverters, transformers and switchgear, designed for the site wind and the clearances the electrical design needs.
Steel canopies → -
Solar carports
OUR STEELParking canopies with modules on top, often with EV chargers below.
Solar and EV charging canopies → -
Fixed-tilt racking
OUR STEELWhere the design calls for structural steel racking, we fabricate the posts, rafters and purlins. Trackers come from their makers.
Solar panel support structures → -
Battery enclosures
BY OTHERSBattery enclosures come complete from their makers. We can add steel platforms, stairs and cable bridges around them.
Access walkways →
Open ground
Three things an open energy site asks of the steel
Remote sites
Bundles are marked by building and loaded so a small crew can sort them at a rural site without a yard.
Open ground, high wind
Open sites see full wind. Canopies and racking are designed for uplift, with base details the foundation design can match.
Corrosion and dust
Galvanized steel suits structures that stand outside for decades with little maintenance.
From our project files
Canopies and frames on open sites
A long parking canopy at the Honda warehouse in the Philippines and warehouse frames on open ground in Thailand: the same canopy and frame work a solar or battery site needs. We have no solar farm reference yet.
Solar and EV canopies
Photo
Photo
Photo
Photo
Scope, in writing
What we supply and what stays with your team
World Steel, our plant in Vietnam
- O&M building, store, canopy, carport and fixed-tilt racking steel designed to the contract documents
- Hot-dip galvanizing by an outside galvanizer in Vietnam, or paint, to the specification
- Shop and erection drawings at no extra cost, ready for your Engineer of Record
- Fabrication in our IAS AC472-accredited plant in Vietnam, packed by site and tracked live in PEB Studio
The US contractor, our customer
- Drawing approval, the PE seal and the permit with your Engineer of Record
- Modules, trackers, battery enclosures, inverters and electrical work
- Foundations, piles, roads and fencing
- Erection, module installation and fit-out
Questions from US contractors
Solar and battery site steel: questions and answers
6 answers, grouped by topic.
Solar and battery sites 3 answers
Do you supply solar trackers?
No. Trackers come from their makers. We supply structural steel: buildings, canopies, carports and fixed-tilt racking where the design calls for it.
Can you supply the O&M building and canopies for several sites?
Yes. The plant fabricates 2,500 t of structural steel a month, so a developer’s sites can be fabricated together and shipped site by site.
Can you build steel around battery enclosures?
Yes: platforms, stairs, cable bridges and canopies around the enclosures. The enclosures and their fire protection come from their makers and the design team.
Design and finish 3 answers
How are canopies designed for wind on open sites?
For the site wind speed and exposure the design team sets, with uplift on the modules taken down through the frame to the foundations.
Can the steel be galvanized?
Yes. Members can be hot-dip galvanized by an outside galvanizer in Vietnam before shipping, which suits steel that stands outdoors for decades.
Do you have solar or battery references?
Not a solar farm yet. Our references are canopies, carports and buildings on open sites, such as the parking canopy at the Honda warehouse in the Philippines.
Keep reading
Related pages
Price it or partner with us
Send the site plan and the steel list.
Share the site plan, the O&M building and the canopies and racking you need. We will price each site and the program.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.