Relay and control room
Long rows of panels on a cable trench or raised floor, with cable tray supports overhead and a clear span so rows can be added later.
Large-project capacity
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
Inside the control house
Point at a room on the plan, or at its card, to see the two together.
Long rows of panels on a cable trench or raised floor, with cable tray supports overhead and a clear span so rows can be added later.
A separate room with its own ventilation and a floor designed for the battery racks. Ventilation and spill control are set by the electrical engineer.
Racks for SCADA and telecom, with cable entries framed in the wall and roof.
Transformers and panels for the building itself, and steel for the HVAC units on the roof or on a pad.
Around the building
Steel stands for switches, bus and instrument transformers, to the loads the electrical design gives.
Machinery support frames →Elevated supports that carry cables from the yard into the building.
Cable tray supports →Covers over outdoor switchgear and storage shelters for spares.
Equipment shelter buildings →From our plant
We have no substation reference yet. These are building frames and built-up members from our plant, the same steel a control house is framed with.
Photo
Photo
Photo
Photo
Scope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
6 answers, grouped by topic.
Yes. The floor system is agreed with the electrical engineer; we frame the building, the cable entries and any steel floor supports around it.
Yes. An end wall framed for extension lets more relay rows be added later on the same column lines.
Yes. Equipment support frames, cable bridges and shelters can ship with the building, galvanized where the utility asks for it.
Yes. The plant fabricates 2,500 t of structural steel a month, so a program of control houses and yard steel can be fabricated in waves and shipped substation by substation.
To the editions in the contract, typically IBC 2024, ASCE 7-22 and AISC 360, and the utility’s own standards where they apply. Approval stays with your Engineer of Record.
Not yet. Our references are steel buildings and heavy built-up members fabricated in our plant; the electrical design stays with the utility’s engineers.
Keep reading
Price it or partner with us
Share the control house layout, the floor system and the yard steel you need. We will price the building and the support frames together.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833