Design step: request for quote

A steel RFQ that can be priced the first time

Send whatever exists today. An estimator and a structural engineer open every file together, pull out the facts that move tonnage, and answer with a written scope or a short list of questions. Below is what each document tells us, and what we do when it is missing.

  • Read by an estimator and an engineer together
  • Files kept in private storage
  • Answered with questions or a written scope

The project file

What each document tells our engineers

Every RFQ is read as one file, not a stack of attachments. This is what we take from each document, and what we do when it has not been prepared yet.

Architectural plans, sections and elevations

What we read from it

Grid spacing, clear heights, roof slope, parapets, canopies and every opening. These set the frame geometry and where bracing can and cannot go.

If it is not ready yet

We propose a grid from the footprint and the use, and mark every dimension we assumed so you can correct it before the proposal.

Structural drawings or the Engineer of Record’s design

What we read from it

Member sizes, connection intent, specified steel grades and the design criteria already set. We price the steel as drawn and, where it helps, add an optimized alternate.

If it is not ready yet

We act as the steel designer: our engineers size the frames, bracing and secondary members to the code basis your Engineer of Record confirms.

IFC model or Revit export

What we read from it

Grids, levels, slab edges and openings in three dimensions, which speeds up the takeoff and cuts the number of questions about heights.

If it is not ready yet

PDF and DWG sets work just as well. The 3D model of the steel is built later in Tekla Structures either way.

Site address

What we read from it

Wind speed, exposure, ground snow and seismic ground motion all come from the site coordinates in ASCE 7. The address also tells us which state and local code edition applies.

If it is not ready yet

This is the one item we cannot price without. A county or ZIP code is enough to start; the exact parcel refines it.

Occupancy and use

What we read from it

Risk category, live loads, collateral loads from ceilings, sprinklers and ducts, and the corrosion environment inside the building, from dry storage to washdown or fertilizer.

If it is not ready yet

We ask a few plain questions: what is stored or made inside, how many people, and whether anything hangs from the roof.

Geotechnical report

What we read from it

Site class for seismic design and the bearing conditions that decide whether pinned or fixed column bases make sense.

If it is not ready yet

We assume pinned bases and a default site class, state both in the scope letter, and recheck once the report arrives.

Cranes, mezzanines and rooftop equipment

What we read from it

Crane capacity, span, service class and wheel loads; mezzanine use and live load; rooftop unit weights and locations. Each changes frame sizes and connection design.

If it is not ready yet

We list them as open items. Leaving out a crane or a heavy unit is the most expensive surprise a steel quote can hold.

Specification sections

What we read from it

Division 05 12 00 Structural Steel Framing, 13 34 19 Metal Building Systems, coating and inspection sections, and any owner steel standard: surface preparation, paint system, galvanizing, connection and testing rules.

If it is not ready yet

We quote our standard coating system and connection practice, name them in the scope letter and price alternates on request.

Bid date and the date steel is needed on site

What we read from it

Your bid timetable and the day the foundations will be ready. Production slots and container bookings are planned backward from the site date.

If it is not ready yet

We quote without a slot and confirm one when you are ready to commit. No production slot is held without a date.

Takeoff or tonnage estimate

What we read from it

A check on scale: whether the job runs through one production slot or several, and how it should be split into shipping lots.

If it is not ready yet

Our own takeoff from the drawings becomes the tonnage in the proposal, broken down by member type.

How much is enough

Three levels of RFQ, three levels of answer

You do not need a full bid set to start a conversation. Match what you send to the answer you need this week.

Enough for a budget scope

A realistic steel weight range and a scope outline, useful for feasibility and owner budgets.

Send

  • Footprint and eave height
  • Site address
  • Building use
  • Any cranes or mezzanines

Enough for a firm proposal

Proposal drawings, a scope letter and a price you can carry into a contract.

Send

  • Architectural set
  • Design criteria or code edition
  • Crane, mezzanine and equipment data
  • Coating and inspection requirements
  • Incoterm you prefer

Enough to bid a large package

A priced scope matched line by line to the bid documents, with clarifications sent before bid day.

Send

  • Complete bid set and addenda
  • Division 05 and 13 specifications
  • Estimated tonnage and phasing
  • Owner steel standard
  • Bid form and due date

Before you hit send

Six gaps that send a steel quote back for repricing

These are the holes we see most often in RFQs from US contractors. Each one is cheap to fill now and expensive to discover at approval.

Code edition left unstated

Many cities and states adopt the IBC a cycle late or with amendments. A quote built on the wrong edition can change loads, and so tonnage, at approval.

Collateral loads missing

Sprinklers, lighting, ducts, solar arrays and hung process equipment are real weight. Added after approval, they can mean heavier purlins and frames.

Crane data only half given

Capacity alone is not enough. Span, hook height, service class and the crane supplier’s wheel loads decide the runway and the columns.

Coating described loosely

“Paint to manufacturer standard” and a named surface preparation plus a named paint system are two different prices. We need to know which one the owner expects.

Scope boundary unclear

Anchor rods, embeds, miscellaneous metals, joists, decking, stairs and doors sit on one side of the line or the other. Unclear items get listed so nobody prices them twice or not at all.

Incoterm and importer not chosen

Who carries freight, who clears customs and who pays US duties changes the number at the bottom. We quote the Incoterm you choose and say who is importer of record.

Large jobs

Bidding a large steel package

On a package of several hundred or several thousand metric tons, the RFQ is a bid set with addenda, not a sketch. We read Division 05 and Division 13 against the drawings, list every conflict or missing item, and send that clarification list before bid day so your number rests on the same assumptions as ours.

Large jobs are also split differently. We look at how the project will be erected, propose fabrication and shipping lots that follow it, and confirm the production slot the plant can hold. Our largest delivered packages include Sunpro Steel at 5,000 metric tons, CPV Food at 2,500 metric tons and the Long Son petrochemical buildings at 2,000 metric tons over more than 56,000 m² (600,000 sq ft).

Painted members strapped into bundles and stacked for the voyage Photo
Bundles made up for an export shipment at the Vietnam plant.

Who owns this step

Clear lines between our scope and yours

World Steel designs and fabricates the steel structure. Approval, the PE seal, the permit and the erection stay with the US contractor and the Engineer of Record they appoint.

World Steel

Designs, details and fabricates the steel in Vietnam

Reads every file, runs the takeoff, lists assumptions and open questions, and proposes a scope of supply that says what is fabricated in Vietnam and what stays local.

Your Engineer of Record

Reviews, approves and seals for your permit

Provides the design criteria if they are already set, or tells us which code edition and loads the jurisdiction will expect.

The US contractor, our customer

Submits, builds the foundations and erects

Sends the documents and the site address, sets the bid and site dates, and chooses the Incoterm and who will be importer of record.

Questions from US contractors

Questions about sending an RFQ

Do I need finished drawings to ask for a quote?

No. A footprint, an eave height, the site address and the building use are enough for a budget scope. Each extra document turns assumptions into facts and tightens the number.

Can I send a Revit model instead of drawings?

Yes. Export it to IFC, or send the model with PDFs of the key sheets. We take grids, levels and openings from it and model the steel in Tekla Structures later.

Is my bid set kept confidential?

Uploads go to private storage, are named at random and are opened only by the World Steel team working on your request. They are never shared with other customers.

Can you quote only part of the steel?

Yes. Many contractors ask us for the primary and secondary framing only, or for one building of a campus. The scope letter draws the line exactly where you want it.

Do you price anchor rods and embeds?

Anchor rods can be supplied with the steel and are listed when they are. Embeds cast into concrete are usually by others. Either way the scope letter says which side of the line each item sits on.

How do you handle addenda on a bid?

Send each addendum as it is issued. We note which revision of the documents the price is based on, and the proposal lists every addendum it includes.

Keep reading

Where this step connects

Have a job on your desk right now?

Send the drawings you have and the site address. An estimator and an engineer will read them together and come back with a scope or the questions that stand between you and a firm price.