Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Products · Structural steel at scale

Steel building doors and windows from our partner plants in Vietnam

Roller shutters, overhead doors, personnel doors, windows and frames are built by established partner manufacturers in Vietnam, sized to the framed openings in your shop drawings and packed with the steel. One supplier, one shipment and one set of documents for the US contractor.

Systems
14
Catalog items
120
Plant output
2,500 t/mo
Rows of steel frames and roof purlins at the Sunpro Steel Factory, 5,000 t of structural steel by World Steel
Photo · Sunpro Steel Factory

Find by building part

Point at the part of the building you are pricing

Every marker opens that system in the catalog below, and pointing at a system in the index lights it up in the drawing of a typical steel building.

Catalog

The catalog, system by system

Each item shows who makes it. Open any item for its specifications and the US codes it is designed to, then add it to your RFQ. You can order one system or the whole building package.

Clear

6 of 120 items shown

Who makes it

Two supply models, one steel package

Every item carries a label for who builds it. Either way, it is made in Vietnam, packed with your steel and shipped together.

Materials from Vietnam, no exceptionsPlate, coil, hot-rolled sections and panels come from mills and plants in Vietnam. Every item can ship under your own brand as OEM or private-label supply.

Designed to

  • AISC 360
  • AISC 341
  • ASCE 7-22
  • MBMA guidance
  • AWS D1.1
  • AWS D1.3
  • AWS D1.8

Plant accredited under IAS AC472 since 2019, with AWS D1.8-qualified welding procedures and welders.

World Steel

What comes with every product

  • Design calculations and drawings to your job’s code basis, ready for your Engineer of Record to review and approve
  • Shop drawings for every member, included at no extra cost
  • Fabrication, welding and coating in our own plant in Vietnam
  • Inspection records, mill certificates (EN 10204 3.1, CVN on request) and live tracking in PEB Studio
  • Tagging, bundling and packing by erection sequence, then shipping to your US port

The US contractor, our customer

What stays with your team

  • Drawing approval and the PE seal, with your Engineer of Record
  • Building permit and local inspections
  • Foundations and setting anchor bolts
  • Steel erection, roofing and cladding installation on site
  • Items bought outside the World Steel package

FAQ

Questions buyers ask about the catalog

Can I order a single product, or only a whole building package?

Both. Large contractors often buy one system, such as primary frames, built-up girders or metal decking, and source the rest elsewhere. Add the items you need to an RFQ and our engineers price exactly that scope.

Which products does World Steel make itself?

Everything labeled “Made by World Steel in Vietnam” is cut, welded, roll-formed and coated in our own plant. Doors, windows and frames labeled “Made by Vietnamese partner plants” are built by established partner manufacturers in Vietnam and ship with your steel package.

Where do the raw materials come from?

All of them come from mills and plants in Vietnam, with no exceptions. Plate, coil and hot-rolled sections arrive with mill certificates, and EN 10204 3.1 certificates with Charpy V-notch results can be supplied on request.

Can the products ship under our own brand?

Yes. Any item in the catalog can be supplied as OEM or private label, with your name on the tags, packing lists and drawings title block.

Which US standards are the products designed to?

Members and connections are designed to AISC 360, with AISC 341 detailing where the seismic system calls for it, loads to ASCE 7-22 and welding to AWS D1.1, D1.3 and D1.8 with qualified procedures and welders. The plant itself holds IAS AC472 accreditation, in place since 2019.

How large an order can the plant take?

The plant fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month and runs several projects in parallel. Our largest published package so far is 5,000 t for the Sunpro Steel Factory.

Open call · US contractors

World Steel is looking for US contractor partners

General contractors, design-build and EPC firms, erectors and dealers who need structural steel: let’s build a long-term, win-win partnership. You win and build the project in your market. Our plant in Vietnam designs, fabricates and supplies the complete steel structure, with 2,500 metric tons a month behind your bids.

You bring

  • Your market and owners
  • EOR approval and permit
  • Foundations and erection

We bring

  • 2,500 t a month, own plant
  • IAS AC472, first in Vietnam
  • Engineering and shop drawings

Pricing the steel for a large US job?

Send the bid documents or a list of the items you need. Our engineers take off the tonnage, check it against the US codes of your job and confirm what World Steel would fabricate and supply.